Laserfiche WebLink
Revised: 02/02/2023 3 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />Cordon off the area with asbestos caution tape. <br />3. Containerize ACM Prior to <br />Transport and Disposal <br />- Inhalation and contact with Hazardous <br />Substances <br />1. Place all ACM generated from the work areas into sealed in double 6- <br />mil bags or securely covered with two layers of 6-mil poly sheeting. The <br />sealed ACM will be placed into either 55-gallon drums or a roll-off <br />container rated for ACM. All containers will be properly labeled. The <br />containers will not be used to hold other materials unless they have <br />been under hazardous waste and DOT requirements. <br />H <br />Bag ACM or cover with visqueen if pieces are too large. <br />Always use tags or labels to ensure the hazard is clearly identified. <br />Equipment Inspection Training <br />No data entered. <br />Involved Personnel: ICS Competent Person, ICS Field Technician <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210