My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised: 02/03/2023 3 <br />Job Steps Hazards Actions to Eliminate or Minimize Hazards RAC <br />3. Stow Tools Away - Pinch Points <br />- Sharp Edges <br />1. Do not place hands between objects that could cause pinching <br />or crushing, (beneath heavy tools or between spring-loaded tool <br />cabinet doors). <br />2. Place Shear tool in proper protective box so tip will not <br />protrude and create a hazard, be aware of other tools or items <br />with sharp edges. <br />L <br />4. Demobilize - Slips/Trips/Falls <br />- Inadequate Communication <br />1. Do a final walk through of the work area to ensure all tools, <br />materials, equipment and debris have been removed. <br />2. Inform all key project personnel onsite and elsewhere when <br />the task has been completed safely, prior to leaving the work <br />area, use signage to communicate any hazards that could not be <br />mitigated. <br />L <br />Equipment Inspection Training <br />Pneumatic Shear Visual Inspection and Functional Test every Shift Field Training <br />Mental Risk Assessment (MRA) <br />Compressor Visual Inspection and Functional Test every Shift Field Training <br />Mental Risk Assessment (MRA) <br />Involved Personnel: ICS Subcontractor <br />NC-25-1137 Tiwana & Sons <br />1210 East Hammer Lane, Stockton, CA 95210
The URL can be used to link to this page
Your browser does not support the video tag.