My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
REMOVAL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2026 8:04:26 PM
Creation date
9/29/2025 3:47:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2025
RECORD_ID
PR0231125
PE
2361 - UST FACILITY
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1210 E HAMMER LN STOCKTON 95210
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> <br />1.0 GENERAL INFORMATION <br /> <br />1.1 INTRODUCTION <br />This Health & Safety Plan (HASP) addresses those activities associated with the scope of work <br />stated in the HASP. It will be implemented by the Site Safety Officer (SSO) during site work. <br />Compliance with this HASP is required of all people and third parties who enter Innovative <br />Construction Solutions’ (ICS) and/or subcontractors’ work areas. Assistance in implementing this <br />HASP can be obtained from the SSO, Project Manager, and/or the Health and Safety Officer <br />(HSO). The content of this HASP may change or undergo revision based on additional information <br />made available to Health and Safety (H&S) personnel, monitoring results, or changes in the scope <br />of work. Any proposed modifications must be reviewed by H&S staff and are subject to approval <br />by the HSO and Project Manager. <br />This site-specific HASP has been prepared for using Innovative Construction Solutions (ICS) and <br />its employees and supplements the Health and Safety training each ICS employee receives. This <br />HASP's health and safety guidelines were prepared specifically for this site. Due to the potentially <br />hazardous nature of the site covered by this HASP and the activity occurring on the site, it is not <br />possible to discover, evaluate, and provide protection for all potential hazards that may be <br />encountered. This HASP is written for the specific site conditions known at the time that this <br />HASP was prepared, purposes, dates, and personnel specified, and must be amended if these <br />conditions change. <br />This HASP is not intended to be used by any other contractor or personnel of any such contractor. <br />This HASP may not address the specific health and safety needs or requirements of any other <br />such contractor and its employees. Neither this HASP nor any part of it should be used for any <br />other site. Subcontractors must develop their own HASP and submit it to the Innovative <br />Construction Solutions (ICS) Health and Safety Department for review and approval before the <br />commencement of work. <br />ICS expressly disclaims all guarantees or warranties, expressed or implied that HASP will meet <br />the needs or requirements of any other such contractor or its employees. ICS, therefore, cannot <br />and does not assume any liability for the use or reuse of the HASP by any other client, contractor, <br />or their employees or agents. Any reliance on the HASP will be such a party's sole risk and liability.
The URL can be used to link to this page
Your browser does not support the video tag.