Laserfiche WebLink
<br />18 <br /> <br />4.0 HEALTH AND SAFETY RISK ANALYSIS <br /> <br />4.1 NON-CHEMICAL HAZARD SUMMARY <br /> <br />Field staff must review the job-specific work plan and coordinate with the project manager to <br />verify that all up-front logistics are completed before starting work, including, but not limited to, <br />permitting, access agreements, and notification to required contacts. A tailgate safety meeting <br />must be held and documented at the beginning of each workday. <br /> <br />Mental Risk Assessment (MRA) procedures must be used during field activities. Weather <br />conditions (heat, cold, rain, and lightning) must also be considered. An Activity Hazard Analysis <br />(AHA) has been completed for the project. If site conditions change, a blank AHA will be included <br />for completion in the field. All Hot Work activities must be pre-approved by the SSO and or HSO. <br /> <br />Table 4-1 presents a summary assessment of non-chemical hazards. <br /> <br />Table 4-1 Assessment of Non-Chemical Hazards <br /> <br />Non-Chemical Hazard Yes No <br />1. . Electrical - overhead lines (if heavy equipment is used) ☒ ☐ <br />2. . Underground utilities ☒ ☐ <br />3. . Coring Equipment ☐ ☒ <br />4. . Drilling Equipment (Geoprobe™, Hollow Stem Auger, etc.) ☐ ☒ <br />5. . Heavy Equipment ☒ ☐ <br />6. . Machinery ☐ ☒ <br />7. . Heat Exposure ☒ ☐ <br />8. . Cold Exposure ☐ ☒ <br />9. . Confined Spaces (includes excavations/trenches > 4-feet) ☐ ☒ <br />10. . Explosive Atmosphere ☐ ☒ <br />11. . Noise ☒ ☐ <br />12. . Ionizing Radiation ☐ ☒ <br />13. . Non-ionizing Radiation ☒ ☐ <br />14. . Fire ☒ ☐ <br />15. . Vehicle Traffic ☐ ☒ <br />16. . Biological ☐ ☒ <br />17. . Excavations/Holes/Ditches/Trenches ☒ ☐ <br />18. . Steep Grades ☐ ☒ <br />19. . Slippery Surfaces ☒ ☐ <br />20. . Uneven Terrain/ Unstable Surfaces ☒ ☐