<br />21 <br /> <br />2. The USA Notification is to be conducted by ICS 48 hours before the job start. Dig Alert <br />Ticket # is TBA. <br /> <br />The ICS SSO is responsible on-site and must ensure that each of the following is addressed: <br /> <br />➢ Locate and mark all underground utilities through inspection and identification by the <br />appropriate utility representative and client representative. <br />➢ Assume all lines are “live” until an appropriate utility representative verifies shut off. Do <br />not assume that the abandonment of a facility site has resulted in the shut-off of the <br />utility supply. <br />➢ Inspect buildings adjacent to the planned activity area to identify cues that indicate the <br />potential for underground and above-ground utility service (e.g., natural gas valves, <br />underground tunnels, water valves or metering pits, compressed air, or gas lines). <br />➢ If a utility representative does not mark utilities within the site boundaries, identify the <br />utility feed location and observe the above visual cues. Intrusive work must be <br />conducted slowly and carefully, especially during the first 3-4 feet (the depth at which <br />most utilities will be located) <br /> <br />Typical subsurface location marks are as follows: <br /> <br /> <br />RED – electrical, <br />YELLOW – gas/oil/steam, <br />BLUE – water, <br />GREEN – sanitary/storm drains/culverts, <br />ORANGE – communications, and <br />WHITE – proposed excavation or boring. <br /> <br /> <br /> <br /> <br />4.2.3 CORING EQUIPMENT <br /> <br />Intentionally Left Blank <br /> <br />4.2.4 DRILLING EQUIPMENT <br /> <br />Intentionally Left Blank <br /> <br />4.2.5 HEAVY EQUIPMENT <br />