My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MATHEWS
>
202
>
2600 - Land Use Program
>
SU-2500817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 2:40:07 PM
Creation date
9/30/2025 3:28:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500817
PE
2626 - USE PERMIT - GENERAL (UP)
STREET_NUMBER
202
Direction
W
STREET_NAME
MATHEWS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19319014
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
202 W MATHEWS RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> PA-2500121 (C) <br /> 2) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No. 17 prior to issuance of the <br /> occupancy permit. (Development Title Section 9-607.040) <br /> 3) The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from <br /> this application. The fee is due and payable at the time of building permit application. The <br /> fee will be based on the current schedule at the time of payment. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolutions R-00-433) <br /> 4) The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application. The fee is due and payable at the time of building permit <br /> application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee will be based <br /> on the current schedule at the time of payment. (Development Title Section 9-803.020 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6) The Flood Protection Development Impact Fee shall be required for this application. The <br /> fee is due and payable prior to issuance of the building permit. The fee will be based on the <br /> current schedule at the time of payment. (Resolutions R-22-135) <br /> 7) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-606) <br /> 8) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 9) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-9360): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2023 Storm Water Quality Control Criteria <br /> Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2023 SWQCCP <br /> c) Trash: A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County's 2023 SWQCCP. <br /> 10) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.