Laserfiche WebLink
31SJ000 , Inc , <br /> S JC0G, Inc. <br /> San Joaquin Co✓1q), jl1lulti-Species Habi'tal Consenlation & Open Space Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br /> SJMSCP HOLD <br /> TO: Local Jurisdiction: Community Development Department Planning Department, Buildjng <br /> Department Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FO. <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1 . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. <br /> If ITMMs are not signed within six nnonths, the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant, SJCOG. Inc. staff will sign the ITMMs. This is the effective date <br /> y of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed TTMMs and prior to any ground disturbance, the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> I being covered (the bond should be valid for no longer than a 6 month period); or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br /> c. Dedicate land in-lieu of fees, either as conservation easements or fee title; or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months fi-om the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br /> b. Dedicate land in-lieu of tees, either as conservation easements or fee title; or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-2500121 (C) <br /> Landowner: Confucius Church of Stockton Applicant: Zachary Wong <br /> Assessor Parcel #s: 193-190-14 <br /> T R , Section(s): <br /> Local Jurisdiction Contact: Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> ,� appropriate fees are paid in compliance with the SJMSCP. <br />