My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MATHEWS
>
202
>
2600 - Land Use Program
>
SU-2500817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 2:40:07 PM
Creation date
9/30/2025 3:28:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500817
PE
2626 - USE PERMIT - GENERAL (UP)
STREET_NUMBER
202
Direction
W
STREET_NAME
MATHEWS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19319014
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
202 W MATHEWS RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin Valley Air Pollution Control District Page 5 of 6 <br /> District Reference No:20251360 <br /> December 5,2025 <br /> stains that are applied to structures, portable buildings, pavements or curbs. <br /> The purpose of this rule is to limit VOC emissions from architectural coatings. <br /> In addition, this rule specifies architectural coatings storage, cleanup and <br /> labeling requirements. Additional information on how to comply with District <br /> Rule 4601 requirements can be found online at: <br /> https://ww2.valleyair.org/media/tkgieusd/rule-4601.pdf <br /> 6d) District Regulation Vlll (Fugitive PM10 Prohibitions) <br /> The project proponent may be required to submit a Construction Notification <br /> Form or submit and receive approval of a Dust Control Plan prior to <br /> commencing any earthmoving activities as described in Regulation VIII, <br /> specifically Rule 8021 — Construction, Demolition, Excavation, Extraction, and <br /> Other Earthmoving Activities. <br /> Should the project result in at least 1-acre in size, the project proponent shall <br /> provide written notification to the District at least 48 hours prior to the project <br /> proponents intent to commence any earthmoving activities pursuant to District <br /> Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other <br /> Earthmoving Activities). Also, should the project result in the disturbance of 5- <br /> acres or more, or will include moving, depositing, or relocating more than 2,500 <br /> cubic yards per day of bulk materials, the project proponent shall submit to the <br /> District a Dust Control Plan pursuant to District Rule 8021 (Construction, <br /> Demolition, Excavation, Extraction, and Other Earthmoving Activities). For <br /> additional information regarding the written notification or Dust Control Plan <br /> requirements, please contact District Compliance staff at (559) 230-5950. <br /> The application for both the Construction Notification and Dust Control Plan can <br /> be found online at: https://ww2.valleyair.org/media/fm3lrbsg/dcp-form.docx <br /> Information about District Regulation VIII can be found online at: <br /> https://ww2.vaIleyair.org/d ustcontrol <br /> 6e) Other District Rules and Regulations <br /> The Project may also be subject to the following District rules: Rule 4102 <br /> (Nuisance) and Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, <br /> Paving and Maintenance Operations). <br />
The URL can be used to link to this page
Your browser does not support the video tag.