My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
2900 - Site Mitigation Program
>
PR0546470
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 1:15:40 PM
Creation date
10/2/2025 3:42:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546470
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0026232
FACILITY_NAME
JB AUTO SALES
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2085 E FREMONT ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1117 Lone Palm Avenue, Suite 201 <br /> AV Modesto, California 95351 <br /> Wr kTc209-579-2221 <br /> ENVIRONMENTAL - GEOTECHNICAL Fax: 209-579-2225 <br /> BUILDING SCIENCES • MATERIALS TESTING <br /> approximate locations shown on Figure 3. ATC anticipates the borings will be installed in the sidewalk <br /> or the roadway depending on the potential presence of utilities and municipal requirements. <br /> The two proposed soil borings will be advanced using cone penetration test (CPT) methods. CPT <br /> borings are proposed in lieu of monitoring wells as a cost saving measure. Drilling will be conducted by <br /> a State-licensed (C57) drilling company. The CPT borings will be advanced to an estimated depth of <br /> approximately 90 feet. The borings will advanced using a direct CPT rig that will log soil lithology from <br /> approximately five feet bgs to the maximum depth explored. A groundwater sample will be collected <br /> from a separate borehole advanced adjacent to each of the CPT borings using a modified Hydropunch® <br /> sampler. Prior to groundwater sampling, a water level meter will be used to confirm that the drive rods <br /> do not contain water. The sampler will then be driven to approximately three feet below the desired <br /> sampling depth and then retracted three feet to expose the disposable Schedule 20 polyvinyl chloride <br /> (PVC) screen and allow groundwater to enter the Hydropunch® sampler. The water samples will be <br /> collected by lowering a 3/4-inch diameter stainless steel bailer through the drive rods to groundwater. <br /> The groundwater will be bailed from the drive rods and decanted into 40-milliliter glass vials. <br /> Following the collection of the samples, the drive rods will be retracted, leaving the disposable drive tip <br /> and four-foot length of PVC well screen in the hole. Following completion, the CPT borings will be <br /> grouted through the drive rods from the total depth explored to surface grade with neat cement. <br /> Sample Analyses <br /> Groundwater samples collected from the borings will be submitted under chain-of-custody procedures <br /> to a State-certified laboratory. The groundwater samples will be analyzed for total petroleum <br /> hydrocarbons quantified as gasoline (TPHg) utilizing EPA Method 8015B; and benzene, toluene, <br /> ethylbenzene, and xylenes (BTEX), methyl tertiary butyl ether (MTBE), ethyl tertiary butyl ether <br /> (ETBE), di-isopropyl ether (DIPE), tertiary amyl ether (TAME), tertiary butyl alcohol (TBA), 1,2- <br /> dichloroethane (1,2-DCA), 1,2-dibromoethane (EDB), and naphthalene utilizing EPA Method 8260B. <br /> Report Preparation <br /> Upon completion of the field activities, a report will be prepared describing the field activities and <br /> laboratory analytical results and will include an assessment of the extent of the petroleum hydrocarbon <br /> release along with recommendations for additional investigation activities if warranted. The report will <br /> be prepared in general accordance with CRWQCB reporting guidelines. <br /> The work described in this workplan will be performed under the direction of a California Registered <br /> Professional Engineer or California Registered Geologist. All work will be performed in accordance <br /> with ATC's Site Specific Health and Safety Plan (HASP). <br /> Proiected Schedule <br /> Once approval of this workplan has been received, ATC will work to obtain an access agreement to <br /> install the proposed off-site wells to the southeast and confirm a schedule for drilling activities. ATC <br /> will notify the SJCEHD at least 48 hours prior to beginning any field activities. The summary report <br /> s:\enviromental\28349\reports\2020 Offsite WP CPT.doc 5 ATC <br />
The URL can be used to link to this page
Your browser does not support the video tag.