OPERATIONAL TIME TIME
<br />DATE STATUS OFFLINE ONLINE
<br />December 20, 2024 ON-LINE
<br />January 9, 2025 OFFLINE
<br />January 10, 2025 OFFLINE
<br />January 11, 2025 ON-LINE
<br />January 15, 2025 ON-LINE
<br />January 30, 2025 ON-LINE
<br />February 5, 2025 OFFLINE
<br />February 5, 2025 ON-LINE 10:15
<br />February 10, 2025 ON-LINE 16:00
<br />February 12, 2025 ON-LINE
<br />February 27, 2025 ON-LINE
<br />March 15, 2025 ON-LINE
<br />March 29, 2025 ON-LINE
<br />NOTES :
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />SYSTEM WAS TURNED OFF TO ALLOW UNIT # 2 TO
<br />DRAIN IN PREPARATION FOR CARBON CHANGEOUT.
<br />5 WELLS RUNNING
<br />4 WELLS RUNNING
<br />CARBON CHANGEOUT ON UNIT 2 WAS COMPLETED.
<br />GAC UNIT 1 IS NOW LEAD AND GAC 2 IS NOW LAG.
<br />SYSTEM WAS TURNED ON FOR A SHORT TIME TO FILL
<br />UP UNIT 2 AND ALLOW CARBON TO SOAK.
<br />5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />EXTRACTION WELLS 3R & 5
<br />DUE TO A POWER ISSUE, EW-3R & 5 WERE OFFLINE.
<br />EW-3R WAS ABLE TO BE PUT BACK ONLINE, BUT EW-5
<br />WILL NEED AN ELECTRICIAN. REPAIRS ARE
<br />SCHEDULED.
<br />5 WELLS RUNNING
<br />EXTRACTION WELLS 3R
<br />5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 REPAIRS COMPLETED AT EW-5. 5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />DEL-TECH GEOTECHNICAL SUPPORT SERVICES, INC.
<br />DOWNTIME LOG
<br />GROUNDWATER TREATMENT SYSTEM MONITORING LOG 2025
<br />SITE: FORWARD LANDFILL / MANTECA, CA.
<br />(209) 232-7967 (OFFICE) * cassandra@deltech1.com (Email)
<br />PUMPING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5
<br />ACTIONS / REASON FOR DOWNTIME
<br />SYSTEM
<br />NAME
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING
<br />EXTRACTION WELLS 1, 2, 3R, 4 & 5 5 WELLS RUNNING
|