Laserfiche WebLink
Foothill Landfill <br />Monitoring Implementation Plan <br /> <br /> <br /> <br />MIP Page 27 <br />8.0 Implementation of the Storm Water Monitoring Program <br />The General Permit requires that a QA/QC program be prepared to ensure that all elements <br />of the MIP are implemented and that they are implemented by properly trained personnel. <br />This program consists of two parts. <br />The first part of the QA/QC program is the Annual Storm Water Monitoring Program <br />Checklist, which lists the elements of the MIP that are to be completed by the Facility <br />personnel. <br />The second part of the QA/QC program is to ensure that the monitoring program is <br />implemented by appropriate individuals who understand the requirements of the SWPPP <br />and MIP. Each person who will perform or supervise sampling and/or perform discharge <br />point inspections (storm and dry season) in accordance with this program must have a <br />working knowledge of this plan, be familiar with the facility's SWPPP, and be otherwise <br />qualified to carry out the associated tasks. Each of these persons will receive a copy of this <br />program for their review and will be annually trained on the requirements of this <br />monitoring plan and proper sample collection and water quality monitoring practices.