My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_8/1/2025/ ANNUAL CORRECTIVE ACTION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_8/1/2025/ ANNUAL CORRECTIVE ACTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:37:31 AM
Creation date
10/6/2025 9:54:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
8/1/2025/ ANNUAL CORRECTIVE ACTION
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Annual Corrective Action Evaluation Report <br /> <br />www.arcadis.com <br />Forward Landfill 2025 Annual CA Eval Rpt_08012025(1) 1 <br />1 Introduction <br />On behalf of Forward, Inc. (Forward), Arcadis U.S., Inc. (Arcadis) has prepared this Annual Corrective Action <br />Evaluation Report for the Forward Landfill (Site), located at 9999 South Austin Road, San Joaquin County, <br />California. This report has been prepared in accordance with Section E.10 of the Monitoring and Reporting <br />Program (MRP) specified in the Forward Landfill Waste Discharge Requirements (WDRs) set forth in the Central <br />Valley Regional Water Quality Control Board (RWQCB) Order No. R5-2024-0002 (RWQCB 2024). The WDR and <br />MRP Order No. R5-2024-0002 (superseding Order No. R5-2014-0006 [RWQCB 2014]) was finalized on February <br />16, 2024. <br />On February 26, 2002, Forward submitted the Evaluation Procedures for Proposed Corrective Action at Austin <br />Road Landfill, Addendum to May 2001 Engineering Feasibility Study (Revised August 2001) (Evaluation <br />Procedures Report; Herst & Associates [Herst] 2002). The Evaluation Procedures Report describes procedures <br />for evaluating the effectiveness of groundwater corrective action measures at the Austin Road Unit of the Site. <br />Since the submittal of the Evaluation Procedures Report, and in accordance with the 2024 MRP, Forward no <br />longer divides the Site into units while reporting. Therefore, this report includes all wells monitored at the Site. The <br />RWQCB later incorporated these procedures into Section B.5 of the 2014 MRP (R5-2014-0006) and then into <br />Section E.10 of the 2024 MRP (R5-2024-0002). This report evaluates the effectiveness of corrective action <br />measures through comparing groundwater monitoring results and total volatile organic compound (TVOC) <br />concentrations temporally and spatially. <br />2 Corrective Actions <br />Corrective action measures implemented at the Site to date include leachate collection systems and landfill cells, <br />landfill gas management, point of compliance (POC) groundwater capture and treatment, residential groundwater <br />treatment systems, and an artificial groundwater recharge basin. <br />The objective of each corrective action measure is detailed below: <br /> Leachate collection systems and landfill cells: Located over the former unlined cell of the Austin Road Unit, <br />this component has created a hydraulic cap to prevent further water percolation through the unlined cell. <br /> Landfill gas management: Landfill gas is managed through a landfill gas collection system, which reduces the <br />release of volatile organic compounds (VOCs) from landfill gas into groundwater underlying the Landfill. <br /> POC groundwater capture and treatment: <br />o Groundwater recovery wells were installed at the POC to capture groundwater and prevent the release of <br />groundwater impacts from the Site to hydraulically downgradient areas. Downgradient wells screened in <br />the shallow and intermediate groundwater zones, located hydraulically downgradient of the recovery well <br />capture zones, have been added to confirm VOC capture at the POC and creation of a clean water front <br />downgradient of the POC. <br />o Currently, extracted groundwater is treated by two 10,000-pound granular activated carbon vessels, <br />which were installed in January 2020. Details regarding the Site’s groundwater treatment system are
The URL can be used to link to this page
Your browser does not support the video tag.