Laserfiche WebLink
Oilfield Environmental and Compliance, INC. <br /> CalRecycle Project:Lodi City Landfill <br /> 432 Geranium Circle Project Number: Awani Drive Reported: <br /> Galt,CA 95632 CA,95814 Project Manager: Sabra Ambrose 27-Mar-12 14:48 <br /> T-1-17.5 <br /> 1201279-07(Solid) <br /> Analyte Result Reporting Units Dilution Batch Prepared Analyzed Method Notes <br /> Limit <br /> Oilfield Environmental and Compliance <br /> Total Metals by EPA 6000/7000 Series Methods <br /> Antimony ND 24 mg/kg 5 A203333 16-Mar-12 19-Mar-12 EPA 6010B <br /> Arsenic ND 4.8 <br /> Barium 140 2.4 " <br /> Beryllium ND 4.8 <br /> Cadmium ND 2.4 <br /> Chromium 36 2.4 " <br /> Cobalt 13 2.4 <br /> Copper 24 2.4 " <br /> Lead 7.4 4.8 <br /> Mercury 0.12 0.079 1 A203346 16-Mar-12 16-Mar-12 EPA 7471A <br /> Molybdenum ND 4.8 5 A203333 16-Mas-12 19-Mar-12 EPA6010B <br /> Nickel 21 2.4 " <br /> Selenium ND 9.7 " <br /> Silver ND 4.8 <br /> Thallium ND 4.8 " <br /> Vanadium 56 9.7 <br /> Zinc <br /> 51 2.4 <br /> Oilfield Environmental and Compliance The results in this report apply to the samples analyzed in accordance with the chain of <br /> custody document.This analytical report must be reproduced in its entirely. <br /> TEL: (805)922-4772 <br /> 307 Roemer Way, Suite 300,Santa Maria, CA 93454 www.oecusa.com FAX: (805)925-3376 <br /> Page 15 of 109 <br />