Laserfiche WebLink
2030 PM—2145 PM PST-AIS began site breakdown and waste staging for demobilization activities back to AIS <br /> Operations Base. <br /> 2200 PM PST-AIS departed site. <br /> 2400 PM PST-Operations completed. <br /> Waste/Material Generated: <br /> 1. 1x55g (oily rags/debris/ppe) <br /> 2. 1x55g(oily absorbent material/debris/ppe) <br /> 3. 1x55 (oily cardboard/metal components) <br /> **Waste/ Material generated staged on-site pending transportation and disposal by generator** <br /> Security Seal Info <br /> Security Seal Removed :#99280587 FXF <br /> Security Seal Affixed:# UL 0630851 <br /> AIS Clean-Up Summary Report Prepared by: <br /> Carlos Sanchez/Response Manager NORCAL Region <br /> American Integrated Services <br />