My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:17:38 PM
Creation date
10/22/2025 9:16:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0529124
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO AM/PM #83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26159011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1340 W Colony RD Ripon 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1: 87 W T1: 87 E T2: 91 T3: Diesel <br /> Are both vent and tank riser piping M Yes ® Yes M Yes N Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model FFS 708692 FFS708692 FFS708692 FFS708692 <br /> What is the OPE response when N Shut off N Shut off ® Shut off ® Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? N No N No N No N No <br /> At what level in the tank is the OPE set to 105 7l8" 105 7I8" 106 318" 105 3I8" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94.75 94.75 94.75 94.75 <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes N Yes N Yes ® Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass N Pass N Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> " Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.