My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:17:38 PM
Creation date
10/22/2025 9:16:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0529124
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO AM/PM #83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26159011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1340 W Colony RD Ripon 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> XCheck this box if tank gauging is used only for inventory control. <br /> ❑Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; <br /> and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ❑ ❑ <br /> ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or"Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> 1) The Diesel Fill Sump 304 sensor was repaired, the safety clip that holds the float was missing and no <br /> brine in the resevoir. A new safety clip was installed to hold the float and approximately 114 gal of brine was <br /> added to the reservoir. Also, approximately 8 oz of brine was added to the 2" reservoir in the vent box. <br /> Inspectors on site. <br /> 14. MONITORING SITE PLAN <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.