Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-2500218 <br /> LOUIS&JEANETTE BARBAGELATA TR/RPCA SOLAR 11, LLC <br /> Conditional Use Permit No. PA-2500218 was approved by the Planning Commission on October 1, <br /> 2026.The effective date of approval is October 12t',2026.This approval will expire on October 121,2029, <br /> which is 36 months from the effective date of approval, unless (1) all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been issued and remain in force, and <br /> (3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified,all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact:Community Development Department, [209] <br /> 468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application.A fee is required for the <br /> Site Plan review. (Development Title Section 9-802.020) <br /> b. APPROVED USE: This approval is for a 3-megawatt(MVV) ground-mounted photovoltaic system <br /> occupying 15.2 acres, as shown on the site plan dated August 14, 2025. (Use Type: Renewable <br /> Energy—Utility-Scale Solar Energy Facility). <br /> c. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-610.070) <br /> d. DECOMMISSIONING PLAN: Prior to issuance of a building permit, a Decommissioning Plan <br /> including financial guarantees must be submitted. (Development Title Section 9-409.430(b)(2)) <br /> e. MAXIMUM HEIGHT: The height of a ground mounted solar array shall not exceed 25 feet. <br /> (Development Title Section 9-409.430[b][11]) <br /> f. SETBACKS: All solar arrays must be setback 30 feet from all property lines. (Development Title <br /> Section 9-409.430[b][12]) <br /> g. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1. All permanent parking lots shall be surfaced and permanently maintained with asphalt concrete <br /> or Portland cement concrete. Bumper guards and/or wheel stops shall be provided when <br /> necessary to protect adjacent structures or properties. (Development Title Section 9-406.060[i]) <br /> 2. Each vehicle parking stall shall be an unobstructed rectangle, minimum 9 feet wide and 20 feet <br /> long. (Development Title Section 9-406.060) <br /> 3. A minimum of one (1) parking spaces shall be provided, one (1) of which shall be ADA <br /> PA-2500218—Conditions of Approval 1 <br />