My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500840
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COMSTOCK
>
18133
>
2600 - Land Use Program
>
SU-2500840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2026 10:06:09 AM
Creation date
10/23/2025 4:14:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500840
PE
2625 - CONDITIONAL USE MINOR (C)
STREET_NUMBER
18133
Direction
E
STREET_NAME
COMSTOCK
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09117006
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
18133 E COMSTOCK RD LINDEN 95236
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Pfograrn <br /> scientifically consequential information thatjustifies the resource's significance. The County shall review and <br /> approve the treatment plan and archaeological testing as appropriate,and the resulting documentation shall be <br /> submitted to the regional repository of the California Historical Resources Information System, per CCR Section <br /> 15126.4(b)(3)(C). <br /> v , E Y r _ 5, F , <br /> e . z . ..,.,'GEO-1.,Unanticipated Fossil Discovery <br /> Paleontological Worker Environmental Awareness Program. Prior to the start of construction,a Paleontological Retain a Qualified Professional Verify Professional Prior to ground San Joaquin County <br /> Principal Investigator, as defined by the Society of Vertebrate Paleontology (SVP), or their designee shall prepare Paleontologist to conduct WEAP training for Paleontologist has been disturbance. Department of <br /> and conduct a paleontological Worker Environmental Awareness Program (WEAP) training for construction all construction personnel. retained and ,conducted Community Development <br /> personnel regarding the appearance of fossils and the procedures for notifying paleontological staff should fossils WEAP training for <br /> be discovered by construction personnel. The WEAP shall discuss the potential to discover paleontological construction p'a_rsonnel. <br /> resources in the Project Site,legal obligations to protect paleontological resources,examples of paleontological The Project Sponsor shall include a Verify that a standard Prior to construction. <br /> resources that may be found in the Project Site, procedures in case a paleontological resource is discovered,and discoveiq clause in every construction inadvertent discovery clause <br /> contact information for the Paleontological Principal Investigator. contract. has been added to every <br /> Unanticipated Discovery of Paleontological Resources.The Project Sponsor shall include a standard inadvertent construction contract. <br /> discovery clause in every construction contract to inform contractors of this requirement: If a potential fossil is In the event of a fossil discovery by the Verify procedures are During ground <br /> discovered during Project construction,construction activity within 50 feet of the find shall cease until the paleontological monitor or construction followed in the event disturbance, as <br /> discovery is examined by a Paleontological Principal Investigator. personnel,halt construction activity within paleontological resources needed. <br /> If the find is determined to be significant,the Paleontological Principal Investigator shall direct all mitigation efforts 50 feet of the find. If it is determined that are identified, <br /> related to paleontological resources consistent with SVP standards,which may include, but are not limited to: the fossil(s) is (are) scientifically significant, <br /> paleontological monitoring;fossil salvage, preparation, and curation; and reporting to surn niarice the follow outlined procedures, <br /> paleontological mitigation efforts that would be submitted to the lead CEQA agency. <br /> Initial Study-Mitigated Negative Declaration 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.