Laserfiche WebLink
San Joaquin Valley Air Pollution Control District Page 3 of 4 <br /> District Reference No:20260997 <br /> September Z 2026 <br /> Per Section 5.0 of the ISR Rule, an Air Impact Assessment (AIA) application is <br /> required to be submitted no later than applying for project-level approval from a <br /> public agency. As of the date of this letter, the District has not received an AIA <br /> application for this Project. Please inform the project proponent to immediately <br /> submit an AIA application to the District to comply with District Rule 9510 so <br /> that proper mitigation and clean air design under ISR can be incorporated into <br /> the Project's design. <br /> Information about how to comply with District Rule 9510 can be found online at: <br /> https://ww2.valleyair.orq/permitting/indirect-sou rce-review-ru le-overview <br /> The AIA application form can be found online at: <br /> https://ww2.valleyair.org/permitting/indirect-sou rce-review-ru le-overview/forms- <br /> and-applications/ <br /> District staff is available to provide assistance and can be reached by phone at <br /> (559) 230-5900 or by email at ISR(a valleyair.org. <br /> 2c) District Rule 4601 (Architectural Coatings) <br /> The Project may be subject to District Rule 4601 since it may utilize <br /> architectural coatings. Architectural coatings are paints, varnishes, sealers, or <br /> stains that are applied to structures, portable buildings, pavements or curbs. <br /> The purpose of this rule is to limit VOC emissions from architectural coatings. <br /> In addition, this rule specifies architectural coatings storage, cleanup and <br /> labeling requirements. Additional information on how to comply with District <br /> Rule 4601 requirements can be found online at: <br /> https://ww2.valleyair.org/media/tk.qjeusd/rule-4601.pd <br /> 2d) District Regulation VIII (Fugitive PM10 Prohibitions) <br /> The project proponent may be required to submit a Construction Notification <br /> Form or submit and receive approval of a Dust Control Plan prior to <br /> commencing any earthmoving activities as described in Regulation VIII, <br /> specifically Rule 8021 — Construction, Demolition, Excavation, Extraction, and <br /> Other Earthmoving Activities. <br /> Should the project result in at least 1-acre in size, the project proponent shall <br /> provide written notification to the District at least 48 hours prior to the project <br /> proponents intent to commence any earthmoving activities pursuant to District <br /> Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other <br /> Earthmoving Activities). Also, should the project result in the disturbance of 5- <br /> acres or more, or will include moving, depositing, or relocating more than 2,500 <br /> cubic yards per day of bulk materials, the project proponent shall submit to the <br /> District a Dust Control Plan pursuant to District Rule 8021 (Construction, <br />