My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 8:58:56 PM
Creation date
11/5/2025 4:40:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231429
PE
2361 - UST FACILITY
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1151 W LOUISE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage flank <br /> Monitoring System Certification Form <br /> S. MONITORING SYSTEM AND PROGRAMMING <br /> A separate Morrlforing System Certification Form must be prepared for each control panel. <br /> Make of Monitoring ystem Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder-Foot TL 350 <br /> Aftach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either; M Monitoring Systern Set-up fD Alarm History Report <br /> All monitoring equipment is operational per manufacturer's specifications? <br /> Secondary containment systems are free of damage. debris, or liquid? <br /> Are the audible and visual alarms operational? ® � <br /> All sensors have been: 9) visually inspected for wiring kinks, breaks and residual a El M <br /> buildup on floats; and ) tested for functionality and confirmed operational? <br /> Are all sensors installed to detect a release at the earliest opportunity In the 0 0 <br /> secondary containment? <br /> The monitoring system set-up was reviewed, and proper settings confirmed? i <br /> Was the monitoring control panel's backup battery visually inspected. functionally <br /> tested, and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- <br /> dispenser containment? <br /> Does the turbine automatically shut dawn if the piping secondary containment 0 <br /> monitoring system fails to operate or is electrically disconnected? Ell <br /> Does the turbine automatically strut dowry if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down? <br /> _ heck all that apply) r] Sump rl UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all <br /> communication equipment operational? <br /> Describe all answers marked "No"or'Fail'and proposed remedy in Secdon 9. <br /> List all monitoiing equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.