Laserfiche WebLink
The post-injection groundwater analytical results will be summarized in subsequent quarterly <br /> groundwater monitoring and sampling reports for the site. A Pilot Test Evaluation Report will be <br /> submitted to the RWQCB after completing a year of pilot test monitoring and sampling. <br /> Nutrien Vernalis, California 6 p <br /> Pilot Test Work Plan <br />