My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
640
>
2300 - Underground Storage Tank Program
>
PR0537924
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 2:12:52 PM
Creation date
11/24/2025 10:05:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0537924
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0021892
FACILITY_NAME
Winters Gateway
STREET_NUMBER
640
Direction
E
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95304
APN
25025012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
640 E ELEVENTH ST TRACY 95304
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 7. LINE LEAK DETECTOR TESTING <br /> C Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes No NA <br /> 0 3 GPH 0 0.1 GPH [M 0.2 GPH <br /> Has the testing apparatus been properly calibrated? © 0 <br /> For emergency generator tank systems, does the LLD create an audible and visual rl I ✓0 <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a ❑ ❑ <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is ❑ <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the ❑ <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the 0 <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected 0 In 0 <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? �✓ <br /> Were all LLDs confirmed operational within regulatory requirements? �✓ ❑ <br /> LLD ID LLD Model Lines Monitored Pass Fail <br /> Q1 VR 859080-001 87 plld ❑✓ El <br /> Q2 VR 859080-001 91 plld 0 FEI <br /> Q3 VR 859080-001 diesel plld © M <br /> 0 ❑ <br /> 0 ❑ <br /> © ❑ <br /> rl ❑ <br /> ® ❑ <br /> © ❑ <br /> © ❑ <br /> 0 ❑ <br /> El ❑ <br /> Describe all answers marked "No"or "Fail"and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.