My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STATE ROUTE 99 W FRONTAGE
>
18853
>
2600 - Land Use Program
>
SU-2500950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 8:31:29 AM
Creation date
11/25/2025 3:37:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500950
PE
2656 - REVISIONS TO ACTIONS (RA)
STREET_NUMBER
18853
Direction
N
STREET_NAME
STATE ROUTE 99 W FRONTAGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322062
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
18853 N STATE ROUTE 99 W FRONTAGE RD ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company' <br /> 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an "Impressed <br /> Current" cathodic protection system.Any proposed facilities, such as metal-conduit, pipes, <br /> service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion-Engineering_ <br /> 12. Pipeline Marker Signs: PG&E needs to-maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services, an existing-PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction-work. The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the-areas within <br /> the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no-impact occurs which-may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> Internal <br />
The URL can be used to link to this page
Your browser does not support the video tag.