Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Super 91 2-Regular 87 <br /> Tank Manufacturer CSI CSI <br /> Tank Capacity 10K 15K <br /> Test Start Time 8:30 8:40 <br /> Initial Reading -10" Hg. -10" Hg. <br /> Test End Time 9:30 9:40 <br /> Final Reading -10" Hg. -10" Hg. <br /> Change in Reading 0" Hg. 0" Hg. <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-91-East 2-91-West 3-87-East 4-87-West <br /> Pipe Manufacturer APT APT APT APT <br /> Test Start Time 9:10 9:15 9:20 9:25 <br /> Initial Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time 10:10 10:15 10:20 10:20 <br /> Final Reading 0 Psi 0 Psi 0 Psi 0 Psi <br /> Change in Reading 5 Psi 5 Psi 5 Psi 5 Psi <br /> Pass/Fail Criteria No Loss No Loss No Loss No Loss <br /> Tightness Test Results ❑ Pass ® Fail ❑ Pass ® Fail ❑ Pass ® Fail ❑ Pass ® Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />