Laserfiche WebLink
LEGEND <br /> ——— Approximate Site Boundary <br /> ® Historical Soil Boring-8/6/2021& <br /> 10/26/2021 <br /> • Soil Boring-9/2023 <br /> 9 Proposed Temporary Soil Vapor Probe <br /> Residential <br /> -'1 <br /> 1 \ <br /> \ SB40 �\ Residential <br /> A <br /> Seepage drain \ <br /> r \ B6/GW6 <br /> 1, B5/GWS <br /> F Leaching line \ <br /> a B4/GW4 / <br /> \, B3/G W3 <br /> Compound Result Water Well ' <br /> \I TPH-DRO 12,544 u I Leaching line \ <br /> / (inferred) SI36(g \ <br /> \ B2/GW2 B10/GW10 WW-1 <br /> \ <br /> SBI 1,200-gallon Bl/GWj_ •B8/GW8 '® septic tank • °P ' <br /> v \ Bll/GW 11W• ® B <br /> ® Building B7/GW-7 <br /> SB2 <br /> Commercial <br /> -N- <br /> 0 80 <br /> Approximate Scale(Feet) <br /> PROD*202201-9478 --_, FIGURE 1 <br /> DRAWN BY:AD o Site Plan and Proposed Borings <br /> SCALE:V=80' <br /> 2546 French Camp Turnpike <br /> DATE:7/31/2025 Stockton,California 95206 <br />