My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_Q3 2025 MONITORING REPORT 10-30-25
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2026 Reports
>
COMPLIANCE INFO_Q3 2025 MONITORING REPORT 10-30-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 9:22:06 AM
Creation date
12/2/2025 3:16:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
Q3 2025 MONITORING REPORT 10-30-25
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2512
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATIONAL <br />DATE STATUS <br />November 1, 2024 OFF-LINE <br />November 1, 2024 OFF-LINE <br />November 1, 2024 ONLINE <br />November 1, 2024 ONLINE <br />November 14, 2024 ONLINE <br />November 14, 2024 ONLINE <br />November 14, 2024 ONLINE <br />November 22, 2024 ONLINE <br />November 27, 2024 ONLINE <br />January 2, 2025 OFF-LINE <br />January 15, 2025 ONLINE <br />January 30, 2025 ONLINE <br />February 8, 2025 OFF-LINE <br />February 21, 2025 ONLINE <br />February 21, 2025 ONLINE <br />February 27, 2025 OFF-LINE <br />February 28, 2025 ONLINE <br />March 1, 2025 ONLINE <br />March 8, 2025 ONLINE <br />March 19, 2025 ONLINE <br />March 19, 2025 ONLINE <br />April 19, 2025 ONLINE <br />June 25, 2025 ONLINE <br />NOTES : <br />D-02 <br />OBSERVED THAT THE POWER CORD FOR D-02 WAS UNPLUGGED. WE <br />ASSUME THAT THIS WAS DUE TO SHEEP RUBBING ALONG THE POST. <br />PUMP WAS PLUGGED BACK IN AND IS ONLINE. <br />FU-04E, FU-05, PL FU-06 <br />OBSERVED THAT THE FACE WAS BROKEN ON THE FLOW METER ON <br />FU-04E. ALSO OBSERVED THAT WE NEED A NEW SOUNDING TUBE IN <br />FU-05. LASTLY, THE PL AT FU-06 NEEDS A NEW SOUNDING TUBE AS <br />WELL. <br />TS-1, TS-2, TS-3, TS-4 <br />NOTICED THAT ALL 4 TEMPORARY SUMPS WERE NOT WORKING <br />PROPERLY. WE DISCOVERED THAT IT WAS BECAUSE THAT THEY <br />WERE CLOGGED. PUMPS HAD TO BE CLEANED OF DEBRIS (LOOKED <br />TO LIKE SHAVINGS OF HDPE), AND REASSEMBLED. ALL 4 PUMPS ARE <br />BACK ONLINE. <br />TS-2 INSTALLED NEW CYCLE COUNTER. <br />TS-3 <br />PUMP WAS CLOGGED AGAIN. PUMP WAS CLEANED AND PUT BACK <br />ONLINE. <br />TS-1 <br />NOTIFIED BY FORWARD EMPLOYEE THAT THIS PUMP WAS LEAKING <br />AND SPRAYING LEACHATE. UPON ARRIVAL, WE NOTICED THAT THE <br />AIR PRESSURE TO THE PUMP WAS LOW, AT 40PSI RATHER THAN <br />80PSI. INITIALLY WE SUSPECTED THAT THE AIR COMPRESSOR WAS <br />NOT FUNCTIONING PROPERLY. ONCE IT WAS CONFIRMED THAT THE <br />AIR COMPRESSOR WAS WORKING THE PUMP WAS REMOVED AND IT <br />WAS DISCOVERED THAT THE 3 BOLTS HOLDING THE LOWER CASING <br />OF THE PUMP TOGETHER WERE BROKEN AND THE CASING WAS <br />GONE. PUMP WAS REMOVED FOR REPAIRS. <br />TS-1 <br />A SPARE PUMP WAS PUT INTO TS-1. ALSO NOTICED THAT THERE <br />WAS A PINCHED AIR LINE AT THIS SUMP, WHICH WAS CAUSING A <br />LEAK. THIS REPAIR WAS ALSO MADE. TS-1 IS BACK ONLINE. <br />FU-05 SOUNDING TUBE IS IN NEED OF REPAIR. <br />D-01N <br />NOTIFIED BY FORWARD EMPLOYEE THAT PART OF THE DISCHARGE <br />PLUMBING FOR THIS SUMP WAS BROKEN. DAMAGED WAS ASSESSED <br />AND PARTS LIST FOR REPAIRS MADE. <br />D-01N REPAIRS COMPLETED. <br />TS-2 <br />OBSERVED THAT THE CYCLE COUNTER FOR THE PUMP WAS NOT <br />MOVING, DESPITE PUMP CYCLING. ATTEMPTED TO FIND SPARE, BUT <br />WAS UNSUCCESSFUL. PUTTING PART LIST TOGETHER TO ORDER <br />NEW AND BACKUP CYCLE COUNTERS. <br />FU-19E AREA AROUND THIS SUMP WAS FLOODED FROM 1/2 - 1/9 <br />FU-19E <br />UNABLE TO COLLECT ACCURATE LEACHATE LEVEL DUE TO <br />VACUUM PLACED ON THE AREA OF THIS SUMP DURING THE SITE <br />VISITS ON 1/15 AND 1/22 <br />FU-05 <br />UNABLE TO COLLECT ACCURATE LEACHATE LEVEL DUE TO <br />VACUUM PLACED ON THE AREA OF THIS SUMP. <br />D-01N <br />OBSERVED A LEAK IN THE CONNECTION BETWEEN DISCHARGE AND <br />MAIN HEADER LINE. LEAK WAS REPAIRED. <br />TS-1 <br />OBSERVED AN AIR LEAK IN THE PUMP FOR TS-1. AIR LEAK WAS <br />REPAIRED. ALSO NOTICED THAT THE MOVEMENT OF THE HEADER <br />LINE CONNECTED TO THE PUMP IS MOVING, AND PUTTING TENSION <br />ON THE PUMP. IT APPEARS TO BE PULLING IT OUT OF THE <br />TEMPORARY SUMP A LITTLE BIT. <br />TS-1 <br />MOVEMENT OF THE HEADER LINE IS PUTTING TENSION ON THE <br />PUMP FOR TS-1. <br />FU-19E <br />REMINDED WORKER WHO ADDS GASOLINE TO GENERATOR TO PLUG <br />IN FU-19E. <br />FU-04W REPAIRED 1/4" VALVE. <br />FU-04E <br />OBSERVED A SMALL LEAK IN DISCHARGE HOSE. LEAK WAS <br />REPAIRED. <br />D-89 SUMP D-89 STILL HAS DIRT IN IT, AND PUMP NEEDS TO BE REPLACED. <br />D-01N, D-01S, & FU-19W <br />OBSERVED THAT THESE SUMPS HAVE BEEN OFFLINE. WENT TO <br />TROUBLESHOOT AND DISCOVERED THAT A MAIN BREAKER HAD <br />BEEN POPPED. ONCE RESTORED PUMPS WERE RUNNING AND BACK <br />ONLINE. <br />FU-05 <br />SOUNDING TUBE HAS BEEN BROKEN ON THIS SUMP AND NEEDS TO <br />BE REPLACED. <br />SUMP <br />NAME ACTIONS / OBSERVATIONS <br />DEL-TECH GEOTECHNICAL SUPPORT SERVICES, INC. <br />(209) 232-7967 (OFFICE) * cassandra@deltech1.com (Email) <br />SITE: FORWARD LANDFILL / MANTECA, CA. <br />SUMP / PAN LYSIMETER OBSERVATION LOG
The URL can be used to link to this page
Your browser does not support the video tag.