Laserfiche WebLink
SAMPLER : METER # : HERON DIPPER T2 -1078 <br />TOTAL <br />LOCATION DATE MONUMENT TIME D.T.W TIME D.T.W.DEPTH <br />AMW-44 7/29/2025 POST 12:20 62.46 12:20 62.46 80.90' <br />AMW-45 7/29/2025 POST 12:16 61.24 12:16 61.24 81.15' <br />AMW-46 7/29/2025 POST 11:41 59.84 11:41 59.84 81.00' <br />AMW-47 7/29/2025 POST 14:45 53.85 14:45 53.85 78.86' <br />AMW-48 7/29/2025 POST 14:48 62.45 14:48 62.45 88.32' <br />AMW-49 7/29/2025 POST 14:53 63.05 14:53 63.05 93.26' <br />AMW-50S 8/8/2025 POST 6:35 65.28 6:35 65.28 90.20' <br />AMW-50M 8/8/2025 POST 6:36 65.25 6:37 65.25 123.30' <br />AMW-51S 8/8/2025 FLUSH 6:39 57.73 6:39 57.73 83.95' <br />AMW-51M 8/8/2025 FLUSH 6:40 57.60 6:41 57.60 119.75' <br />AMW-52S 8/8/2025 FLUSH 59.75' <br />AMW-52M 8/8/2025 FLUSH 6:44 56.65 6:44 56.65 120.35' <br />AMW-54R 7/29/2025 POST 9:06 31.30 9:07 31.30 44.50' <br />AMW-55 7/29/2025 POST 9:02 47.60 9:02 47.60 64.27' <br />AMW-56 7/29/2025 POST 9:23 67.90 9:24 67.90 118.81' <br />AMW-57S 7/29/2025 POST 10:20 64.52 10:21 64.52 82.20' <br />AMW-57M 7/29/2025 POST 10:23 64.85 10:24 64.85 118.42' <br />AMW-58S 8/7/2025 POST 7:22 61.62 7:22 61.62 78.24' <br />AMW-58M 8/7/2025 POST 7:21 61.75 7:21 61.75 119.61' <br />AMW-59S 8/7/2025 POST 7:25 62.04 7:25 62.04 77.90' <br />AMW-59M 8/7/2025 POST 7:26 62.40 7:26 62.40 117.42' <br />AMW-60S 8/7/2025 POST 7:18 63.91 7:18 63.91 80.00' <br />AMW-60M 8/7/2025 POST 7:17 63.36 7:17 63.36 114.10' <br />AMW-61S 8/8/2025 POST 6:07 62.55 6:07 62.55 80.00' <br />AMW-61M 8/8/2025 POST 6:28 62.80 6:28 62.80 115.00' <br />AMW-62 7/29/2025 POST 9:31 67.75 9:32 67.75 80.00' <br />AMW-63 7/29/2025 POST 9:27 65.94 9:28 65.94 80.00' <br />AMW-64 7/29/2025 POST 9:13 68.30 9:13 68.30 82.50' <br />CDCR-EW-1 8/8/2025 POST 6:22 59.95 6:22 59.95 100.50' <br />CDCR-EW-2 8/8/2025 POST 6:24 60.20 6:24 60.20 139.20' <br />CDCR-EW-3 8/8/2025 POST 6:30 62.55 6:30 62.55 123.10' <br />CDCR-EW-4 8/8/2025 POST 7:20 61.70 7:20 61.70 125.14' <br />CDCR-EW-5 8/8/2025 POST 6:33 65.17 6:33 65.17 148.20' <br />PZ-1 8/8/2025 POST 6:18 61.35 6:18 61.35 97.70' <br />PZ-2 8/8/2025 POST 6:15 61.70 6:15 61.70 101.70' <br />PZ-3 8/8/2025 POST 6:19 61.50 6:19 61.50 122.55' <br />ALL MEASUREMENTS ARE MADE FROM THE NORTH SIDE AND TOP EDGE OF THE WELL CASING. THE TOP OF CASING IS MARKED WITH A NOTCH OR PERMANENT MARKER, <br />WHICH EVER ONE CONDITION IS APPROPRIATE. <br />DEPTH TO WATER MEASUREMENTS <br />DEL-TECH GEOTECHNICAL SUPPORT, INC. <br />(209) 232-7967 (OFFICE) * cassandra@deltech1.com (Email) <br />FORWARD LANDFILL <br />9999 S AUSTIN ROAD / MANTECA, CA. <br />MONITORING WELL FIELD SUMMARY LOG 2025 <br />PAGE 3 OF 3 <br />ANTONIO MORALES <br />3RD. QUARTER <br />BASELINE SECONDARY <br />WATER LEVEL HAS GONE BELOW TOP OF PUMP. UNABLE TO MEASURE.