Laserfiche WebLink
SA N J OAQ U I N Environmental Health Department <br /> COUNTY Jasjit Kang, REHS, Director <br /> Muniappa Naidu,REHS,Assistant Director <br /> crr o�N Greatness grows here. PROGRAM COORDINATORS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng, REHS <br /> Steven Shih, REHS <br /> Elena Manzo,REHS <br /> Natalia Subbotnikova,REHS <br /> December 18, 2025 <br /> To: San Joaquin County Community Development Department <br /> Attention: Jacob Pahule <br /> From: Aaron Gooderham (209) 616-3062 9� EMAILED <br /> Senior Registered Environmental Health Specialist DEC 19 2025 <br /> RE: PA-2500310 (A), Referral, SU-2500902N� <br /> 25575 N. HWY 99 Frontage Road, Acampo �Y' <br /> The following requirements have been identified as pertinent to this project. Other requirements <br /> may also apply. These requirements cannot be modified. <br /> 1) Submit Water Provision Declaration form to the Environmental Health Department for review. <br /> 2) Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0338, to determine if the existing well can be permitted as a <br /> public water system prior to issuance of building permits. If a public water system is required, <br /> applicant shall submit a Small Public Water System preliminary technical report to the <br /> California State Water Resources Control Board, Division of Drinking Water (Water Board) <br /> at least six months before initiating construction of any water related improvement, as <br /> defined. The issuance of a permit to operate a small public water system by the local primacy <br /> agency (EHD) is prohibited without the concurrence of the Water Board. Please contact Gena <br /> Farley with the SWRCB Division of Drinking Water at Gena.Farley@waterboards.ca.gov or <br /> 209-948-7488, concerning the requirements for preliminary technical report submittal prior to <br /> issuance of building permits. <br /> 3) If the Water Board determines that an onsite well shall be used as the potable water source, <br /> a permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to issuance of building permits. To issue a permit to operate, concurrence from <br /> the Water Board is required. A yearly permit to operate a public water system will be required <br /> by the EHD prior to sign off of the certificate of final occupancy (San Joaquin County <br /> Development Title, Section 9-602.010 and 9-601.030.). <br /> 4) The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-602.010 and 9-601.030 and C.C.R., Title 22, and <br /> Health and Safety Code, Section 116525 116570. <br /> 5) Construction of an individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development (San Joaquin <br /> County Development Title, Section 9-601.010 (b)). <br /> 1868 E. Hazelton Avenue I Stockton, California 952051 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />