My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500902
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STATE ROUTE 99 W FRONTAGE
>
25575
>
2600 - Land Use Program
>
SU-2500902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2026 4:43:49 PM
Creation date
12/11/2025 11:26:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500902
PE
2631 - ADMINISTRATIVE USE - MINOR (A)
STREET_NUMBER
25575
Direction
N
STREET_NAME
STATE ROUTE 99 W FRONTAGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00514134
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
25575 N STATE ROUTE 99 W FRONTAGE RD ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-2500310 (A) -2- <br /> 3) If the applicant intends to utilize STAA trucks with this project approval, then applicant shall <br /> obtain from the Department of Public Works and Caltrans a STAA terminal and STAA route <br /> designations for the proposed facility. Contact the Transportation Engineering Division of <br /> the Department of Public Works (209-468-3707) for designation process. <br /> 4) The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from <br /> this application. The fee is due and payable at the time of building permit application. The <br /> fee will be based on the current schedule at the time of payment. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolutions R-00-433) <br /> 5) The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application. The fee is due and payable at the time of building permit <br /> application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GM:GG <br />
The URL can be used to link to this page
Your browser does not support the video tag.