My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500952
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
SU-2500952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 9:24:04 AM
Creation date
12/15/2025 8:43:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500952
PE
2690 - LOT LINE ADJUSTMENT (LA)
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19327019
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
10500 S HARLAN RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Pacific Gas and Electric Company <br /> PGEPlanReview@pge.com <br /> Electric Company Land Management <br /> 300 Lakeside Drive <br /> Oakland,CA 94612 <br /> December 30, 2025 <br /> Re: Gas and Electric Transmission and Distribution <br /> Dear Sean Cardenas, <br /> Thank you for providing PG&E the opportunity to review your proposed plans for PA-2500352 <br /> (LA). Our review indicates the proposed work and/or improvements do not appear to directly <br /> interfere with any of PG&E's existing facilities or land rights. <br /> Please note, this is our preliminary review and PG&E may provide additional comments in the <br /> future as the project progresses or if additional information is provided. If there are subsequent <br /> modifications made to the design, we ask that the plans be resubmitted for review to the email <br /> address listed below. <br /> If PG&E gas and/or electric service are needed,please submit an application through PG&E's <br /> Your Project Portal: Sign In (yourprojects- e.com). <br /> As a reminder,before any digging or excavation occurs,please contact Underground Service <br /> Alert(USA)by dialing 811 a minimum of two (2)working days prior to commencing any work. <br /> This free and independent service will ensure that all existing underground utilities are identified <br /> and marked on-site. <br /> If you have any questions regarding this response, please contact me at(877)259-8314 or <br /> pgeplanreviewAp eg_com <br /> Sincerely, <br /> PG&E Plan Review Team <br /> Land Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.