My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500952
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
SU-2500952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 9:24:04 AM
Creation date
12/15/2025 8:43:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500952
PE
2690 - LOT LINE ADJUSTMENT (LA)
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19327019
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
10500 S HARLAN RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Plan Review Team PGEPlanReview@pge.com <br /> Electric Company Land Management <br /> December 16, 2025 <br /> Sean Cardenas <br /> Office Assistant Specialist <br /> 44 N. San Joaquin Street <br /> Stockton, CA 95202 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Sean Cardenas, <br /> Thank you for submitting the PA-2500352 (LA) project plans for our review. PG&E will review <br /> the submitted plans in relationship to any existing Gas and Electric facilities within the project <br /> area. If the proposed project is adjacent/or within PG&E owned property and/or easements, we <br /> will be working with you to ensure compatible uses and activities near our facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) <br /> and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br /> your safety and to protect PG&E's facilities and its existing rights. <br /> Below is additional information for your review: <br /> 1. This plan review process does not replace the application process for PG&E gas or <br /> electric service your project may require. For these requests, please continue to work <br /> with PG&E Service Planning: https://www.pge.com/en/account/service- <br /> requests/building-and-renovation.html. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PG&E's facilities are to be incorporated within <br /> any CEQA document. PG&E needs to verify that the CEQA document will identify any <br /> required future PG&E services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or new <br /> installation of PG&E facilities. <br /> Any proposed uses within the PG&E fee strip and/or easement, may include a California Public <br /> Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the <br /> necessity to incorporate a CPUC Section 851filing is required. <br /> This letter does not constitute PG&E's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PG&E will provide a project specific response as required. <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PG&E Gas and Electric Facilities Page 1 <br /> Internal <br />
The URL can be used to link to this page
Your browser does not support the video tag.