My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 8:57:05 PM
Creation date
1/2/2026 5:01:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231028
PE
2361 - UST FACILITY
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4950 BUCKLEY COVE WAY STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 9. MONITORING SITE PLAN <br /> Attach a copy of the facility's UST Monitoring Site Plan that shows the general layout of tanks and <br /> dispensers, locations of the monitoring panel and all other release detection equipment, VPH monitoring <br /> zones (if applicable), and the date the site plan was prepared. Include a legend for all symbols depicted. <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN 4950 BUCKLEY COVE WAY, STOCKTON CA 95219 <br /> If a site plan has been prepared that shows all required information,you may include it, rather than this page <br /> with your monitoring system certification form.the site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel and all leak detection equipment and monitoring locations. include <br /> a legend for all symbols depicted. <br /> DISPENSERS----,, DISPENSERS <br /> D DSL 89 <br /> `8\LF, <br /> �S <br /> l <br /> d <br /> OCEAN SIDE 'LF <br /> e� <br /> r <br /> VENTS <br /> G <br /> O a <br /> J� <br /> A A <br /> SHORE SIDE T Al T,L <br /> F <br /> RD DSL 89 <br /> F <br /> LEGEND <br /> • MONITORING PANEL RONAN X78-S L 89 LINE LEAK STP-MLD-G <br /> DETECTOR <br /> A DSL ANNULAR SENSOR LS-4 <br /> Al 87 ANNULAR SENSOR LS-3 L1 DSL LINE LEAK DETECTOR VMI-99LD-2000 <br /> E FILL SUMP LS-3 <br /> LIQUID SENSOR <br /> T TURBINE SUMP LS-3 <br /> LIQUID SENSOR <br /> B BRINE SENSOR TANK SUMP AND UDC INTERSTITAL SPACES ARE <br /> CONTINUOUSLY MONITORED BY VEEDER ROOT <br /> VR VAPOR Z 794380-304 SENSOR.ALL LINES ARE <br /> CONTINUOUSLY MONITORED UNDER VACUUM BY <br /> P = PROBE VEEDER R00T 332175-001 SENSOR <br /> C =FLOATS&CHAINS <br /> E =STOP <br /> PRODUCT PIPING ='_ VENT RISER 000 <br /> VAPOR RECOVERY 30 15 0 30 60 90 <br /> PIPING <br /> SCALE 1"=30' <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 6of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.