My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2501022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUBBARD
>
3824
>
2600 - Land Use Program
>
SU-2501022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 9:18:44 AM
Creation date
1/5/2026 10:44:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2501022
PE
2690 - LOT LINE ADJUSTMENT (LA)
STREET_NUMBER
3824
Direction
N
STREET_NAME
HUBBARD
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
08707014
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3824 N HUBBARD AVE STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"<. <br /> SAN JOAQUIN Community Development Department <br /> \ COUNTY Planning Building Code Enforcement - Fire Prevention <br /> CommunityDevelopment Department P P Jennifer Jolley, Director <br /> Eric Merlo,Assistant Director <br /> Tim Burns, Code Enforcement Chief <br /> Corinne King, Deputy Director of Planning <br /> Jeff Niemeyer, Deputy Director of Building Inspection <br /> APPLICATION REFERRAL: Short Review Period: <br /> Staff Review 2-week response time. <br /> Project Planner: Francisco Prado Phone: (209)468-8359 Fax: (209)468-3163 Email: fprado@sjgov.org <br /> The following project has been filed with this Department: APPLICATION NUMBER: PA-2500357 (LA) <br /> SU-2501022 (2690) 6M <br /> PROPERTY OWNER: Chelsea Chandler APPLICANT: Dillon and Murphy <br /> P.O. Box 9041 P.O. Box 2180 <br /> Stockton, CA 95208 Lodi, CA 95241 <br /> PROJECT DESCRIPTION: A Lot Line Adjustment application between two parcels. Parcel 1 to contain 35,300 square feet <br /> and Parcel 2 to contain 21,600 square feet. The parcels are accessed by North Hubbard Avenue and East Cherokee <br /> Road. Parcel 1 is served by on-site well and septic, and natural drainage. Parcel 2 is served by natural storm drainage, <br /> however, does not currently have well and septic. The parcels are not under Williamson Act contract. <br /> The Property is zoned R-L (Low Density Residential) and the General Plan designation is R/L (Low Density Residential). <br /> PROJECT LOCATION: The project site is on the east side of North Hubbard Avenue, 350 feet north of East Cherokee <br /> Lane, Stockton. (APN/Address: 087-070-14/3824 N Hubbard Ave, Stockton)(Supervisorial District: 4) <br /> APPLICATION REVIEW: Recommendations and/or comments on this project must be submitted to the Community <br /> Development Department (Phone: [209] 468-8359 or via email at fprado@sjgov.org) no later than January 19, 2026. <br /> Recommendations and/or comments received after that date may not be considered in staff's analysis. <br /> AGENCY REFERRALS MAILED ON: January 5, 2026 <br /> TO: <br /> SJC Supervisor: District 4 SJC Public Works Linden Unified School District <br /> SJC Building Division/ Plan Check SJC Sheriff Communications Director Waterloo-Morada Fire District <br /> SJC Environmental Health SJC Assessor Stockton East Water District <br /> SJC Fire Prevention Bureau PG&E <br /> 1810 E Hazelton Avenue I Stockton, California 95205 1 (209)468-3121 1 sjgov.org/department/cdd <br />
The URL can be used to link to this page
Your browser does not support the video tag.