My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2501023
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHERRYLAND
>
2817
>
2600 - Land Use Program
>
SU-2501023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 2:27:44 PM
Creation date
1/8/2026 12:04:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2501023
PE
2634 -ZONING COMPLIANCE REVIEW - MINOR (Z)
STREET_NUMBER
2817
Direction
N
STREET_NAME
CHERRYLAND
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
08710065
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
2817 2 N CHERRYLAND AVE STOCKTON 95215
Suite #
2
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-2500359 (Z), Referral, SU-2501023 Page 2 of 2 <br /> 2817 N. Cherryland Avenue, Stockton, APN: 087-100-65 January 14, 2026 <br /> i. If an underground storage tank (UST) system will be installed, a permit is required <br /> to be submitted to, and approved by, the San Joaquin County Environmental Health <br /> Department (EHD) before any UST installation work can begin. <br /> ii. Additionally, an EHD UST permit to operate is required once the approved UST <br /> system is installed. <br /> e. Storage of at least 1,320 gallons of petroleum aboveground or any amount of petroleum <br /> stored below grade in a vault — Aboveground Petroleum Storage Program (HSC <br /> Sections 25270.6 & 25270 et sec.) <br /> i. Spill Prevention, Countermeasures and Control (SPCC) Plan requirement <br /> f. Threshold quantities of regulated substances stored onsite - California Accidental <br /> Release Prevention (CaIARP) Program (Title 19, Section 2735.4 & HSC Section <br /> 25531 et sec.) <br /> i. Risk Management Plan requirement for covered processes <br />
The URL can be used to link to this page
Your browser does not support the video tag.