Laserfiche WebLink
Department of Public Works <br /> � SANJOAQUIN140, <br /> Fritz Buchr»an,Director <br /> COUNTY -- <br /> „ Sao rJoagata eaaarg Alex Chetley,Deputy Director-Development <br /> � 1It�w' ite[rliC'S` i,Y )14 a f(f'. <br /> Woz.ldna fati-YOU Kristi Rhea,Deputy Director-Administration <br /> David Tolliver,Deputy Director-Operations <br /> January 20, 2026 Najee Zarif, Deputy Director-Engineering <br /> MEMORANDUM <br /> TO: Community Development Department <br /> CONTACT PERSON: Jessica Leal <br /> FROM: George Montross, Development Services Engineer <br /> Development Services Division YN <br /> SUBJECT: PA-2500390 (Z); A Zoning Compliance Review application for ground mount solar in <br /> OS/RC (Open Space Resource Conservation). The parcel is accessed from East <br /> Mehrten Road. The parcel is served by on-site well and septic, and natural storm <br /> drainage. The parcel is not under Williamson Act contract; located on the north side of <br /> East Mehrten Road, 0.9 miles northeast of North Mackville Road, Clements. <br /> (Supervisorial District 4) <br /> OWNER: Jennifer G Redmond & Delwyn Smith APPLICANT: Same <br /> ADDRESS: 19597 E Mehrten Road, Clements APN: 023-020-28 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated <br /> Flood Hazard Area designated as Zone AE. <br /> RECOMMENDATIONS: <br /> 1) An encroachment permit shall be required for all work within road right-of-way. (Note: <br /> Driveway encroachment permits are for flatwork only—all vertical features, including but <br /> not limited to fences, walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-607.020 and 9-607.040) <br /> 2) The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Improvement Standards Drawing No. 17 prior to issuance of the <br /> occupancy permit. (Development Title Section 9-607.040) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 1810 East Hazelton Avenue I Stockton, California 95205 ( T 209 468 3000 1 F 209 468 2999 <br /> Lq Follow us on Facebook @ PublicWorksSJC Visit our website: www,sjgov.org/pubworks <br />