My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 1:18:22 PM
Creation date
1/15/2026 8:01:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0232587
PE
2361 - UST FACILITY
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1103 S MAIN ST MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:CHEVRON 201761 201761 Date: 1/5/2026 <br /> Address:1103 S.MAIN ST.PERMIT NUMB.N-3315 Name:Jesus Saldivar <br /> City/State:MANTECA CA <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram C r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS r r <br /> 5 Do all E-Stops shutdown power to ALL STP's r r <br /> 6 Are ALL E-Stops clearly Labeled r r <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled r r <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. <br /> 9 All safety barricades and test equipment has been properly removed r r <br /> 10 E-Stop was reset and all dispensing functions are normal r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2387481 <br />
The URL can be used to link to this page
Your browser does not support the video tag.