Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 9. MONITORING SITE PLAN <br /> Attach a copy of the facility's UST Monitoring Site Plan that shows the general layout of tanks and <br /> dispensers,. locations of the monitoring panel and all other release defection equipment, VPH monitoring <br /> zones {f applicable), and the date the site plan was prepared. Include a legend for all symbols depicted. <br /> �� y�yK 1RrN2 <br /> Y?�fStj <br /> w Oh 3rf a Chevron#209167 <br /> 7'W3NL�-2 i <br /> 794M-W_ 1234 E_Yosemite Ave_ <br /> Manteca.CA <br /> ESO <br /> BSC1 <br /> CAR BLACK LINES ARE <br /> WASH <br /> PIPING LINES <br /> Es � <br /> W ! G T) I i <br /> 3tF'SS SL?r5 eas <br /> Describe all answers marked "No" or "Fail'and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Secrion 8. <br /> Page 6 of 6 <br />