My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2026 9:50:06 AM
Creation date
1/16/2026 9:04:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0516248
PE
2361 - UST FACILITY
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1234 E YOSEMITE AVE MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:CHEVRON 209167 209167 Date:2/4/2026 <br /> Address: 1234 E.YOSEMITE AVE @ SPRECKLES Name:Jesus Saldivar <br /> City/State:MANTECA CA �4-1Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 3 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram (: r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS (t r r <br /> 5 Do all E-Stops shutdown power to ALL STP's (0- r l' <br /> 6 Are ALL E-Stops clearly Labeled r r f <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled (: r r <br /> POSTTEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. (t r r <br /> 9 All safety barricades and test equipment has been properly removed r r r' <br /> 10 E-Stop was reset and all dispensing functions are normal G r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2387486 <br />
The URL can be used to link to this page
Your browser does not support the video tag.