Item Description Units Unit Price Quantity Total Cost6 ACCESS ROAD CONSTRUCTIONPerimeter Road ConstructionComponents: Purchase, Hauling and Placing Aggregate base. Assumed subgrade preparation is included in construction of final cover. Road is approximately 15,000 feet long covering an area of 225,000 sf with 0.5 feet of compacted aggregate base.Class II AB ton 49.00$ 8160 399,840$ Water Truck w/ Operator hr. 209.50$ 41 8,590$ Steel Drum Roller w/ Operator hr. 225.13$ 41 9,231$ Motor Grader w/ Operator hr. 319.18$ 41 13,086$ Grade Checker hr. 125.90$ 41 5,162$ Subtotal, Access Road 435,909$ 7 EROSION CONTROL AND VEGETATIVE LAYERErosion Control and Vegetative LayerComponents: Preparation of soil with hydroseeding, fertilizing, and mulching of final cover and disturbed soil surfaces. Area to be vegetated includes the final cover surface and the estimated disturbed area of on-site borrow source for an estimated total of 826 acres.Foreman hr. 131.83$ 312 41,130$ D4 Dozer w/ Operator hr. 201.25$ 312 62,790$ Vegetation (hydroseeding, mulching, fertilizing) ac 5,000$ 700 3,500,000$ Grade Checker hr. 125.90$ 312 39,281$ Subtotal, Erosion Control and Vegetative Layer 3,643,201$ ACCESS ROAD, EROSION CONTROL, AND VEGETATIVE LAYERFOOTHILL SANITARY LANDFILLFoothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsxPage 6 of 15