Laserfiche WebLink
Item Description1FINAL COVER2 LEACHATE CONTROL SYSTEM3 LANDFILL GAS MONITORING AND CONTROL4 GROUNDWATER MONITORING5DRAINAGE CONTROL6 ACCESS AND SITE SECURITY7 EROSION CONTROL AND VEGETATIVE LAYER8 SECURITY, STRUCTURE REMOVAL, AND DECOMMISSIONING9FINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN1SUBTOTALTOTAL CLOSURE COSTNotes:1 The cost for the Final Closure and Post-Closure Plan is included in the cost for Item 1E-1.$96,400SUMMARYFOOTHILL SANITARY LANDFILLTotal Cost$170,000$34,358,328CONTINGENCY @20%$6,871,666$41,229,994$0$368,374$435,909$3,643,201$28,462,837$65,000$1,116,607Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsxPage 8 of 15