My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2026 2:53:38 PM
Creation date
1/21/2026 9:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231401
PE
2361 - UST FACILITY
FACILITY_ID
FA0006388
FACILITY_NAME
PLATINUM GAS & MARTKET #3
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
950 W ELEVENTH ST TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for Platinum Gas & Market#3 as of January 15, 2026. <br /> Open violations from August 05, 2025 inspection <br /> Violation#10-2030074-Annual Monitoring System Certification Form to the CUPA within 30 days of <br /> completion of the test. <br /> OBSERVATION:Annual monitoring system certification and leak detector testing was performed on 8/21/2024 and a <br /> test report was submitted on 4/8/2025, 200 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION:Take all necessary precautions to ensure testing and submittal of test reports are performed <br /> in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#13-2010017-Spill bucket testing results submitted to the UPA within 30 days of testing. <br /> OBSERVATION:Annual spill container testing was performed on 8/21/2024 and a test report was submitted on <br /> 4/8/2025, 190 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION:Take all necessary precautions to ensure testing and submittal of test reports are performed <br /> in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#14-2010018-Overfill prevention equipment inspection report form submitted to the UPA within <br /> 30 days. <br /> OBSERVATION:An overfill prevention testing was performed on 8/21/2024 and a test report was submitted on <br /> 4/8/2025, 190 days late. <br /> REGULATION GUIDANCE:A copy of the test report must be submitted within 30 days of the tests. <br /> CORRECTIVE ACTION:Take all necessary precautions to ensure testing and submittal of test reports are performed <br /> in a timely manner. <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.