Laserfiche WebLink
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for Platinum Gas & Market#3 as of January 15, 2026. <br /> Open violations from August 21, 2024 inspection <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#69-2030033-A current UST monitoring plan has been submitted and is readily accessible at the <br /> facility. <br /> OBSERVATION:An approved copy of the monitoring plans were not available for inspection. <br /> REGULATION GUIDANCE:A copy of these plans shall be accessible on site at all times. <br /> CORRECTIVE ACTION: Immediately locate and retain a copy on site. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 5 of 5 <br />