Laserfiche WebLink
Red ThreadT`" IIA, DualoyTM 3000/L&3000/LCX Installation Checklist R <br /> lull <br /> HANDLING <br /> General <br /> Red Thread I Dualoy3000/L&3000/LCX UL/ULC Listed primary and secondary pipingsystems are rated to <br /> thefollowing maximum operating ratings: <br /> Primary:2"@ 250 psig;3"@ 175 psig;4"@ 125 psig Secondary:3"-4"@ 50 psig;6"@ 20 psig <br /> Owner/Operator(please print&sign name)Owner&Store No. Aka, Sown ArmcT LA*►E JobSiteAddress qw $ouT,k Aimol2T LAMC, STOc15,T04 CA <br /> Ownersite Representative SEAA) Am MI I Signature <br /> Installation CompanyandAdnndress "�otUA) COuWTi2 Coa7QA(,fOfLS 3?.06 Ltn uuC o- PAOLtto Co&WVA CA- <br /> Installation Foreman FtlziEL Signature <br /> InstallationDate(s) PkIAt14(L 6COA)1)AFl H <br /> Review the Important Notice Section on page 2 before completing <br /> Pre-Installation Checklist(indicate date verified after each item) Installer's Foreman Owner/Operator Rep. <br /> Installer shall show evidence that: / <br /> 1. He/She is licensed or certified by the state implementing agency(where applicable). 1/wq <br /> 2. Each bonder on site is current in his/her manufacturer's training(recommended every 3years). <br /> Installer has current manufacturer's installation instructions: q 16�2'� <br /> Installation manual number_JL?,$O Manual Dated IO�20lb <br /> Pipe&fittings have UL(Underwriters'Laboratories)or ULC(Canada)label.NOTE:label maybe located on the box for some /y/16' / <br /> fittings. ll( Y- <br /> Proper tools and adhesive are on-site per manufacturer's recommendations. q tl ZY <br /> Pipe&Fittings inspection: <br /> 1. Impactor puncture Cutout.See Footnote l for repairs. /^ � <br /> 2. Damaged tapers...Cutoff and re-taper. <br /> 3.Check bonding surfaces for ultraviolet weathering degradation. % 10 <br /> 4. Replace any missing pipe end caps to protect tapers until time to install. <br /> Trench: jq <br /> 1.Allow for minimum of 6"bedding material. <br /> 2. Have required slope per owner's design documents or local requirement. <br /> 3.Width:Allow for 4"minimum separation between pipes and 6"minimum from trench walls. <br /> Approved backfill(NO native soil): <br /> 1.CleaProvide shed ll per owner's design documents;orat a minimum: <br /> 2.Clean washed sand,or <br /> 3. Pea gravel-1/8"to 3/4"particle size,or <br /> 4. Refer to Footnote 1 for other backf ill materials. <br /> Installation Procedures(Indicate date verified after each item) <br /> 1.6"of approved bedding material. <br /> 2. Dry fit system priorto adhesive bonding.See Footnote l. <br /> 3. Heat assist required for adhesive curing when temperature is below507(10°C).See Footnote 1. <br /> 4.A minimum separation of 4"between pipe runs and 21/2'on crossovers. \ ^ - <br /> 5. Bedding/backfill supports pipe completely on runs and crossovers. <br /> 6. Minimum of 6"approved backfill cover material or more as required by local authorities or design documents. <br /> 7. If surface is unpaved,a minimum of 18"of approved backfill(for2"pipe)is required.See Footnote 1. <br /> Inspection and Testing(Indicate date verified after each item) <br /> 1.Cocked joints(misaligned tapers).See Footnote 2. <br /> 2.Joint Back off,See Footnote 2. V V <br /> 3.Check for proper cure of adhesive bond.See Adhesive Kit instructions. <br /> 4.Test piping system in accordance with manufacturer's recommendations or local requirements,See Footnote 3. <br /> 5.Secondary containment piping,See Footnote l. <br /> See Footnotes on following page <br /> Fiber Glass Systems I KEY P oductionSolutions <br />