Laserfiche WebLink
NOTE: INSTALLATION NOTES: �p <br /> •CONTRACTOR ASSUMES RESPONS{BILITY TO 1 1. INSTALL DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING <br /> ASSURE THAT THE OPERABLE SYSTEM MEETS THE OF HYDROSTATIC ANNULAR SPACES BY"VEEDER-ROOT'TANK AND PIPING <br /> DFSPGN INTENT AND THE CONTRACTOR IS , MCNITOR AND ALARM SYSTEM.ALL TANK.SUMPS SHALL BE DOUBLE WALL <br /> PERMITTED TO ADJUST PIPING LOCATIONS BASED AND BE INDIVIDUALLY CONTINUOUSLY MONITORED BY'VEEDER-ROOT" <br /> ON ACTUAL FIELD CONDITIONS AND INSTALLATION 1 UQUID SENSORS TIED INTO THE TANK&PIPING MONITOR SYSTEM.TANKS TO <br /> TECHNIOUES- BE SET MIN.60'BELOW FINISH GRADE.TANK INSTALLATION SHALL BE IN <br /> •PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE l ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br /> TOWARD TANK 1tS'PER FOOT MINIMUM,114'PER 2. INSTALL A 8"CONCRETE SLAB OVER TANKS.SURFACE WATER SHALL BE <br /> FOOT PREFERRED. + DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN <br /> •SECQN DARY CONTAINMENT PIPING*SHOWN BY WITH A 1Are DROP IN 18-FROM THE EDGE OF THE MANHOLE RING TO THE <br /> NOTE ONLY,NOT GRAP144ALLY.ALL PIPING 70 BE ° SURROUNDING SLAS ELEVATION.CONSTRUCT SLAB PER CIVIL SLAB <br /> DOUBLE CONTAINMENT PIPE. ` INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAIL$ <br /> 1 3. INSTALL MULTIPLES FILL PACKAGE IN A DOUBLE1 FILL SUMP. ,-0. INSTALL VARIABLE SPEED TURBINES IN UNDERGROUND STORAGE TANKS <br /> -PROPERTY LINE VERIFY PROGRAMMING REDUI REMENTS FOR ALTERNATING STARTS WITH <br /> LOCAL AGENCY AS REQUIRED.TURBINE SYSTEMS TO BE EQVIPPFu WITH 3 <br /> GPH ELECTRONIC UNE LEAK DETECTION.LEAK DETECTORS ARE TO BE <br /> `-' TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP.CONTRACTOR <br /> TO PROVIDE TEST DATA AT THE TIME OF PUNCH LAST AS WELL AS INCLUDE IN <br /> r N 7 1°G3'V0"E 1 1 6,61' CLOSE OUT BINDER.SET TURBINE INTAKES AT 5"FROM BOTTOM OF TANKS. <br /> TURF INES TO BE EOU PPED WITH INTAKE FILTER SCREENS CONTRACTOR IS <br /> TO LABEL TURBINES AND CONTROLLERS AS TO WHICH PRODUCT THEY ARCS <br /> LJ W .n SERVE.GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE <br /> V <br /> \ OFF OR LOSE POWER. <br /> \�O S. INSTALL 3'INSIDE 4-FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR AP WEST TOAST PROO11CT5,LLC <br /> H� <br /> VAPOR RECOVERY SYSTEM.SLOPE t18"PER FOOT MINIMUM TO TANKS�C? INSTALL 3'TO 2'REDUCING TEES WERE HEADERS BRANCH TO DISPENSERS- <br /> CONTRACTOR TO INSTALL TRACER TAPE WITH VAPOR PIPING.TESTING OF <br /> �iS7• (C\ VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL.PRIOR TO PAVING <br /> SLOPE ALL VENT PIPING tld' AND BEFORE STATION OPERATION.SEE DETAILS AND SCOPE OF WORK ON <br /> PER FOOT PREFERRED.11W \ SHEETS CS-1&CS-2 FOR PIPE SIZING AT UNDERGROUND STORAGE TANKS. <br /> PER FOOT MINIMUM 6. INSTALL 2"INSIDE 3'DOUBLE WALL FIBERGLASS PRODUCT SUPPLY LINES TO <br /> DISPENSERS.PIPING SHALL BE INSTALLED PER MANUFACTURERS <br /> 17 218 9 SPECIFICATIONS AND INSTRUCTIONS.PIPING SHALL BE INSTALLED WITH A <br /> VENT RISER MINIMUM SLOPE OF 118"PER FOOT FROM THE FURTHEST DISPENSER SUMP <br /> ASSEMBLY DOWN TO THE TURBINE SUMPS.CONTRACTOR TO INSTALL TRACER TAPE <br /> WITH PRODUCT PIPING.TESTING OF PRODUCT LINES SHALL BE PERFORMED <br /> PRIOR TO BACKFILL,PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> TO TRUCK [ 7. INSTALL'VEEDER-ROOT"TANK AND LINE ALARM CONTROL PANEL 1N$UILOING MM DATE NrAPW pLy[1tl'riDl <br /> DISPENSER.�- __ _ _ _ _ _ _ _ _ -__- _ -_--_-- _ —_—-_--_ _ ___ I EL NORMALLY DRAWINGS <br /> FOR <br /> IN BUILDING.5EE ARCHITECTURAL AND <br /> SEE SHEET l rr----------_--__------ ------- ----_---- ------------- �� � 1 ELECTRICAL DRAWINGS FOR EXACT <br /> LOCATION. <br /> F-3 I d' 1 • 8. INSTALL A SINGLE 2-INSIDE 3-FRP VENT LINE FOR EACH UNDERGROUND ice. swPecR nDD�r <br /> STORAGE TANK O A SINGLE 27 FRP VENT LANE FOR THE DEF TANK <br /> FOOT <br /> le" . <br /> I I I 1 1 \ k DEF RI:MO SLOPE 1Pd'PER FOOT Lt PER FOOT MINIMUM)TO TANKS AS SHOWN. © mn�w r[wm.ucLw uaenL <br /> I j I I i I n I FILL BOX CONTRACTOR TO INSTALL TRACER TAPE WITH VENT PIPING.SECONDARY 0 raaw. n m.DecLKca.an <br /> I I I I CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION <br /> e I I I a 214216217 a k1 I 1 EF ONLY <br /> I I I 9 TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12'ABOVE GRADE Q <br /> }Il AND NOT WITHIN 5'FROM ANY BUILDING OPENING OR PROPERTY LINE THAT—71 <br /> CAN BE BUILT UPON.VENT RISERS SHALL BE INSTALLED IN ACCORDANCE <br /> 1 4 WITH UNIFORM FIRE CODE REOUI REMENTS.VERIFY LOCAL REGULATIONS 0 <br /> O I I I O O I I FOR ADDITIONAL EOUIPMENT OR INSTALLATION REQUIREMENTS. ❑ <br /> 20 3+1 I REGU I 1 10- INSTALL A SINGLE T-RIGID GALVANIZED CONDUIT FOR EACH NEWLY <br /> 24K I 8 INSTALLED TURBINE PUMP. <br /> I 1 i I I 11. INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORI NO , <br /> i SENSORS.SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER <br /> AND SUMPS. <br /> I I I 1 1 DIESEL 1$- INSTALL EXTRACTOR A$$EMBLI ES FOR VENT,AND STAGE II VAPOR <br /> 3•0 3+0 1 I I 1 3.(I 209 1[[ RECOVERY AT TURBINE SIDE SUMP.VERIFY WITH LOCAL JURISDICTION FOR <br /> ALTERNATE REOUIRED LOCATIONS. <br /> I I I 1 I r fff[[[ I 13- INSTALL.1 GPH MAG PROBE TANK LEVEL GAUGES AT TURBINE SUMPS AS <br /> I L-_ N G �J 1 SHOWN. <br /> Lam... _ A 204 205 93 17 14. TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API <br /> 21-0 2f7 TYP.OF 7) i IDENTI FECATION MARKINGS AT FILL MANHOLES. <br /> 31'TYPICAL e d 206 247 248 15. INSTALL WAYNE OVATION SERIES.MULTI-PRODUCT DISPENSERS AS SHOWN. <br /> TYP. 3 12 i DISPENSERS TO BE FITTED WITH STAGE 11 NOSES,NOZZLES AND SREAKAWAY <br /> -- VALVES-CONTRACTOR IS RESPONSIBLE FOR INS7RLLIM1IG HOSES.NOZZLES <br /> TYP 4 10 13 I AND BREAKAWAYS.INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> 11 INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING <br /> f 13'(CANOPY) AUTO CANOPY.SEE I SENSORS-START UP BY MANUFACTURER REPRESENTATIVE.GENERAL <br /> MANUFACTURER 2114 205 OB 13 17 CONTRACTOR TD PURGE LINES VATH A MINIMUM OF 200 GALLONS THROUGH <br /> PLANS FOR DETAILS 4 EACH HOSEINOZZ E.ANY AIR POCKETS OR START UP PROBLEMS DUE TO <br /> R£MIUM 8 IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ,,,,�„• <br /> I ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR.AFTER PURGING """`•""'"' <br /> DIESEL THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, <br /> SK CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED FILTERS WITH NEW <br /> d 208 21 218 FILTERS. <br /> �I 16. INSTALL WAYNE OVATION SERIES,HIGH FLOW DISPENSERS AS SHOWN. <br /> OESPENSERS TO BE FITTED WITH HOSES.NOZZLES AND BREAKAWAY VALVES. �•ay..s��.....n� <br /> LI CONTRACTOR 1S RESPONSIBLE FOR INSTALLING HOSES,NOZZLES AND <br /> BREAKAWAYS.INSTALL DOUBLE WALL UNDER DISPENSER CONTAINMENT <br /> MINIMUM 20' INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING r wmwatnal: <br /> ESTOP RADIUS SENSORS.START UP BY MANUFACTURER REPRESENTATIVE.GENERAL <br /> CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH UNDERGROUND STORAGE <br /> EACH HOSEINOZZLE.ANY AIR POCKETS OR START UP PROBLEMS DUE TO TANK STANDARDS <br /> ® IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS <br /> ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR,AFTER PURGING ELEMENT TPOT <br /> � THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, V•15.0 2D23 SERIES <br /> CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED FILTERS WITH NEW <br /> FILTERS. <br /> 17. FILL AND STAGE I VAPOR RECOVERY RISERS&ANNULAR RISER SHALL BE <br /> GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATPONS A° g <br /> SEE CS-1&CS-2 FOR CALIFORNIA DESIGN WITH DOUBLE WALL SUMPS. <br /> MAKIMUM 100' - LEGEND: 18- ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS 4607 S.AIRPORT WAY <br /> E-STOP RADIUS �� _ RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. <br /> REGULAR GASOLINE PRODUCT PIPING,M"DWp FIG' 19, INSTALL OVERFILL ALARM&ACKNOWLEDGMENT SWITCH.EEO IN LOCATION STOCKTON.CA 95206 <br /> PREMIUM PRODUCT PIPING,2'13'DW FIG' SHOWN.ALARM AND SWITCH TO BE LOCATED TO PROVIDE AN <br /> E-ST'-lE UNOBSTRUCTED VIEW TO TRUCK DRIVER.PROVIDE BOLLARD PROTECTION <br /> ill <br /> DIESEL PRODUCT PIPING.2T3'DAN FIG' OF FREE STANDING POLE-SEE WIRING DIAGRAM AND DETAIL FOR MOU NT I''NG <br /> 5-20 PRODUCT PIPING.Y14"DNY FIG' REQUIREMENTS. ULMM h, <br /> VENT PIPING,2'r3"QAW FIG 20, PROVIDE 1=IRE EXTINGUISHER:KID-10 460 10#4:A-W-BC OR EQUAL. <br /> VAPOR RECOVERY PIPING,2"a D!W FJG m mom <br /> VAPOR RECOVERY PIPING,3Y4'DAW FIG .,.:Dr. A l R <br /> ------ DEF PRODUCT PIPING.2-13'DAY FIG- Apzk I°B¢T IIQ <br /> DEF VENT PIPING.27 SAIV FIG <br /> GA-d79S <br /> SEE MATERIALS ON SHEET FM•1 AND FM-2 Mim VI,L <br /> AUTO DISPENSER <br /> �/ AND TANK <br /> =- WORK AREA <br /> AM/PM <br /> sN¢r nrs <br /> C-STORE J��'*** <br /> t. Im 0 10 20 F_2 <br /> I INCH=10 FEET <br /> 1.1 <br />