My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosptec <br /> consultants <br /> 4. REPORTING AND SCHEDULE <br /> Pending CVRWQCB approval of the above scope of work and obtaining required permits, field <br /> implementation of off-Site investigation can commence within six weeks following approval of the Work <br /> Plan. The investigation is anticipated to be completed within one week. Indoor air and sub-slab sampling <br /> events in occupied suites must be coordinated with the occupying business' operations and property owner. <br /> The work will be scheduled during the summer months of 2025 or 2026,pending Work Plan approval and <br /> access. <br /> Following receipt of the laboratory analytical reports and validation of the data, Geosyntec will transmit <br /> the results to the CVRWQCB in the Site Investigation Report (Report). At minimum, this Report will <br /> include: <br /> • A summary of the field activities and sampling procedures implemented; <br /> • Summary of and rationale for deviations from the Work Plan,if any; <br /> • Discussion of the sample results and appended laboratory analytical reports; <br /> • Comparison of analytical results to applicable screening levels for a commercial/industrial land <br /> use scenario; <br /> • QA/QC procedures that were implemented for field and laboratory work; and <br /> • Conclusions and recommendations. <br /> The Report will be submitted to the CVRWQCB within 60 days of receipt of analytical data. <br /> 12 September 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.