My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2601808
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INTERMODAL
>
2880
>
2900 - Site Mitigation Program
>
SR2601808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 4:30:58 PM
Creation date
1/26/2026 4:29:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2601808
PE
2900 - Site Mitigation Program
STREET_NUMBER
2880
STREET_NAME
INTERMODAL
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19820022
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2880 INTERMODAL WAY MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec "' 1111 Broadway, Floor <br /> Oakland,Californias 94607 <br /> PH 510.836.3034 <br /> consultants www.geosyntee.com <br /> January 15, 2026 <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Avenue <br /> Stockton, California 95205 <br /> Subject: Permit Application for Phase II Environmental Site Assessment <br /> 2880 Intermodal Way Manteca, California 95336 <br /> To Whom it May Concern: <br /> Geosyntec Consultants, Inc. (Geosyntec)has prepared the enclosed site mitigation well and boring <br /> permit application to perform a Phase II Environmental Site Assessment (ESA) for the properties <br /> at 2880 Intermodal Way located in Manteca, California 95336(the"Subject Property"or"Site"). <br /> 1. FIELD ACTIVITIES <br /> Field activities to be performed as part of this limited investigation will be conducted with <br /> assistance from Cascade Drilling,a California-licensed C-57 drilling subcontractor,for installation <br /> of soil borings and direct-push groundwater grab samples,if achievable given groundwater depths <br /> below the Site(estimated to be approximately 6-15 feet below ground surface (feet bgs)).A total of <br /> eight(8)borings are proposed to be advanced via hand auger, and drill rig equipped with direct push <br /> tooling (for three of the eight borings). For proposed sample locations and boring depths, refer to <br /> Figure I and Attachment 1. <br /> Field tasks include: <br /> Geophysical Survey <br /> Geosyntec will coordinate with a geophysical services firm to conduct a subsurface geophysical <br /> survey to attempt to identify locations of potential underground utilities in the vicinity of the <br /> proposed boring locations. <br /> Soil Sampling <br /> Geosyntec will facilitate the collection of discrete soil samples at eight borings at depths up to <br /> 5 feet below ground surface (bgs) to assess soil conditions at the Site. A total of 24 soil samples <br /> are proposed to be collected over the 8 borings. Soil cuttings and decontamination water will <br /> be containerized separately in 55-gallon waste drums for disposal. <br /> Following the collection of media samples, boreholes will be abandoned, as described in <br /> further detail below. The soil samples will be analyzed by a Cal-ELAP certified laboratory. <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.