My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601071
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STATE ROUTE 99 W FRONTAGE
>
18621
>
2600 - Land Use Program
>
SU-2601071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2026 4:41:00 PM
Creation date
1/28/2026 2:56:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601071
PE
2634 -ZONING COMPLIANCE REVIEW - MINOR (Z)
STREET_NUMBER
18621
Direction
N
STREET_NAME
STATE ROUTE 99 W FRONTAGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322035
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
18621 N STATE ROUTE 99 W FRONTAGE RD ACAMPO 95220
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARDS AND ORDINANCE REQUIREMENTS <br /> PA-2500118 <br /> FAITH COMMUNITY CHURCH NAZARENE/SNIDER CONSTRUCTION <br /> Zoning Compliance Review No. PA-2500118 (Z) was approved by the Community Development <br /> Department on February 18,2026.The effective date of approval is February 18,2026.This approval <br /> will expire on February 18, 2029,which is 36 months from the effective date of approval, unless (1) <br /> all Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> issued and remain in force,and(3)all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Those requirements followed by a Section Number have been identified as Ordinance Requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other ordinance <br /> requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: (209)468-3121) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-508) <br /> b. APPROVED USE: This approval is for the expansion of an existing 24,343-square-foot church. <br /> The expansion includes a 3,200-square-foot metal accessory building with electrical service for <br /> church storage as shown on Site Plan dated December 11,2025. (Use Type:Accessory-Assembly <br /> —Religious) <br /> This approval is in addition to a previously approved Site Approval application No. UP-96-0005 <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-610.070) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: (209)468-3000, see memo dated February 11, 2026) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Contact: (209) 468-3420, see memo dated February 3, <br /> 2026) <br /> NOTES AND INFORMATION ONLY <br /> See Pacific Gas and Electric memo dated February 17,2026 <br /> PA-2500118 (Z)—Standards and Ordinance Requirements 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.