Laserfiche WebLink
n� <br /> W <br /> A D G A D G U <br /> Electrical Plan to Govern <br /> s o <br /> V H <br /> - - - w <br /> O- N <br /> O1-1 N <br /> ridge ventilation LO <br /> -I U <br /> v) <br /> 2. 1 - 2. 1 > z o <br /> 00 <br /> O <br /> o <br /> Drawn By cm <br /> checker DEW <br /> Job# 160043 <br /> 3. 1 3. 1 Scale Noted <br /> Revision Schedule <br /> # Date Description <br /> A 12/01/25 CYC 1 -Zoning <br /> Submittal <br /> 2 N Metal Building Roof Plan 1 Metal Building RCP <br /> 4.0 1/8" = 1'-01' 4.0 1/8" = 1'-0" <br /> Division 16- General Electrical: <br /> General <br /> 1. Install all electrical in this work per LATEST N.E.C. and City of Stockton Building <br /> Dept. requirements. Flexible conduit may be used but must carry ground wire <br /> box.Switch lighting as indicated on drawings.All circuits as required by other <br /> trades. General electrical maybe run in flexible metal conduit, MC or EMT or <br /> romex. MC cable housed in concealed wall or ceiling. <br /> Install all fixtures per MFG required. Use only approved and listed equipment. <br /> 2. Conductors shall be copper conductors type THWN/THHN. Use connectors <br /> approved for related wire size.The use of stranded or solid approved. Use <br /> stranded for sizes #8 or larger. <br /> 3.All work shall conform to the CEC 2022 edition and to the applicable <br /> requirements of local,state, and federal code(s) and/or agencies having cn <br /> jurisdiction; and shall take precedence over work shown. Any discrepancies `" <br /> shall be brought to the attention of the designer prior to the installation of work. H <br /> Q <br /> 4. Electrical contractor shall verify diagrammatic layout of electrical work with <br /> owner prior to installation. U <br /> 5.See electrical symbols,verify all symbols and conditions as required prior to C <br /> installation. � V' <br /> cn <br /> Job Conditions Q <br /> 6. Electrical drawings:The electrical drawings, as contained, are essentially aS <br /> diagrammatic and although the size and location of equipment are shown to <br /> scale wherever possible contractor shall make use of all data and verify this <br /> information at the building site.The dates indicated on the drawings and in the <br /> job conditions and decisions of the designer will govern exact locations, <br /> distances, levels, and other conditions. <br /> 7. Operation: 2132 N El Dorado St <br /> The system shall be complete and fully functioning to the satisfaction of the Stockton, CA 95204 <br /> designer and the owner. Install all circuits, J-Boxes,wiring disconnects and any (209) 227-7646 <br /> other equipment needed to provide electrical service for signage. <br /> 8. Drawings: �o �0S SS/0 <br /> The layout of light fixtures are to be divided in the room as shown on the plans. <br /> Any questions about layout should be directed to the engineer. Upon Q- F <br /> completion of the installation, furnish a set of'record' (as-built) drawings to the <br /> designer clearly marked with the changes authorized during construction, CD m 'MT'cutting/nothing/ w 76963 Z <br /> drilling contractor shall be responsible for all work herein including cutting, EXP. 12 31 26 <br /> boring, notching, furring and drilling as necessary to complete this project. <br /> "Note: no cutting, boring, notching, furring and drilling of truss or other structural sr9 CIVI�Fc��\P <br /> members will be allowed. Contractor shall coordinate with other trades to OF CA <br /> allow for group runs and eliminate any overlapping or obstruction. <br /> These drawings and specifications are <br /> 9.Working Clearances the property and copyright of JCWagner <br /> Working clearances requirements for all electrical equipment including &Associates and shall not be used or <br /> disconnects will be maintained as per CEC 2022 article 110.26 duplicated in part or in whole on any <br /> other work except by agreement with <br /> 10.Completion of Work and Test JCWagner&Associates. <br /> The entire electrical system shall be free from any short circuits, and improper <br /> grounds. Demonstrate with the owner and designer that the entire installation is RCP & Roof <br /> complete and in proper operating condition. <br /> Plan <br /> a <br /> v <br /> ci <br /> v <br /> to <br /> U, <br /> N <br /> O A400 <br /> N <br />