Laserfiche WebLink
PREPARED FOR: <br /> UTILITY NOTES SINGLE LINE DIAGRAM CD <br /> 0 <br /> lV <br /> KEY NOTES: w <br /> ONEW MYERS/RYCO (OR APPROVED I` <br /> EQUIVALENT)SWITCHBOARD 600A, • rm <br /> 120/208, 3PH, 4W- NEMA 3R ENCLOSURE (E) UTILITY POLE ( , �,.� <br /> #120937061, (NEW �"1 J <br /> NEW INTEGRATED LOAD CENTER(PANEL VERTICAL BRIDGE U LL <br /> UTILITY GENERAL NOTES: O A) INTERSECT INC MANUFACTURE (AA POWER P.O.C.) Z <br /> 300-3R SERIES MODEL AA 3003R-458-6M (N)CONDUCTORS BY PG&E IN �� LU O <br /> 1. ALL NEW GROUNDINGS FOR ELECTRICAL ROUTE METER MUST BE DONE PER CEC, NEC& LOCAL /� 2 I- <br /> BUILDING &SAFETY REQUIREMENTS. -3S)W/200AMP/2POLE, ATS, 120/208 V, (1)4"CONDUIT BY GC (±580') `V 2 Q <br /> 1-PHASE, 3WIRE, 42KAIC W/30 POSITIONS (N)3'X5' SPLICE BOX5 PER 0 W <br /> 2. ALL NEW CONDUIT FROM ELECTRICAL ROUTE METER TO THE SITE MUST BE RGS CONDUITS. PROVIDED BY VERIZON WIRELESS. PG&E DESIGN C) Q <br /> • rME4 LL U <br /> INSTALL WEATHERPROOF PULL BOXES AS REQD. PER CEC, NEC& LOCAL BLDG. & SAFETY NEW AUTOMATIC TRANSFER SWITCH 0 0 <br /> REQUIREMENTS & MUST HAVE TRAFFIC COVERS. O GENERAC ASCO SERIES 300L, 200 AMP, c , 00 <br /> 3. ALL NEW PULL BOXES MUST BE HOT-DIPPED GALVANIZED AND WEATHERPROOF 120/208V, 1PHASE, 3WIRE, 2 POLE,42 KAIC ^ Q <br /> /a ) 0- <br /> 4. ALL NEW WIRE SPLICES PULL BOXES DONE PER CEC & NEC. Lo <br /> NOTE: <br /> 5. FIELD VERIFY EXACT ELECTRICAL CONDUIT ROUTE. IN ACCORDANCE WITH CEC 110.16 T (N)75 KVA PG&E <br /> PROVIDE ARC FLASH PROTECTION TRANSFORMER, 600 <br /> 6. VERIZON WIRELESS NEW METER/MAIN NEED TO BE LABELED &ALL CLEARANCE FOR ELECTRICAL WARNING LABLES. LABLES SHALL AMPS,120/208V, 3PHASE <br /> EQUIPMENT BY CEC& NEC. BE PER ANSI Z635.4 GUIDELINES VENDOR: <br /> , <br /> 7. NEW GROUND RODS MAY BE USED FOR SITE GROUNDING IF DESIRED RESISTANCE IS ACHIEVED. (N)3/4" C W/#2 GROUND CONDUIT CONDUITCOPPER BONDED TO 5/8"X 10, - O <br /> LONG COPPERCLAD STEEL AREA AREA <br /> 8. CONTRACTOR TO INSTALL UTILITY CONDUIT(LATERAL). GROUND ROD O <br /> OUTDOOR ENCLOSURE <br /> 9. UTILITY POINTS OF SERVICE AND WORK/MATERIALS SHOWN ARE BASED UPON PRELIMINARY EUSERC354 <br /> INFORMATION PROVIDED BY THE UTILITY COMPANY AND ARE FOR BID PURPOSES ONLY. EL CTRIPG&EL METVERIZON WIRELESS <br /> (N)750QPX BY PG&E IN (2)5"C ELECTRICAL METERING 200 P. MARSHALL &ASSOCIATES <br /> (U/G-PVC SCH 40±) BY GC, 1#6 CUTLER-HAMMER AMPERE, 120/208 VOLT, 3 PHASE, A CENTERLINE COMMUNICATIONS COMPANY <br /> 10. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY FOR FINAL AND EXACT WORK/ <br /> MATERIALS REQUIREMENTS AND CONSTRUCT TO UTILITY COMPANY ENGINEERING PLANS AND GROUND, COPPER THHN/THWN-2 CIRCUIT BREAKER O 4 WIRE, ESD 35KVA,VD 3.5V <br /> SPECIFICATIONS ONLY. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT, PULL ROPES, 600AMPL�K 1000 HOLCOMB WOODS PKWY,SUITE 210 <br /> SOCKETS EUSERC 306 ROSWELL,GA 30076 <br /> CABLES, PULL BOXES, CONCRETE ENCASEMENT OF CONDUIT(IF REQUIRED), TRANSFORMER O OFFICE(678)280-2325 <br /> PAD, BARRIERS, POLE RISERS, TRENCHING, BACKFILL, PAY ALL UTILITY COMPANY FEES AND (N) SWITCHBOARD 600A, 120/208, TEST BLOCKS EUSERC 311 <br /> INCLUDE ALL REQUIREMENTS IN SCOPE OF WORK. 3PH - NEMA 3R ENCLOSURE O O <br /> METAL COVER <br /> AND HASP SOCKETS EUSERC 306 <br /> ISSUE STATUS: <br /> TEST BLOCKS EUSERC 311 <br /> IfREV. DATE DESCRIPTION BY <br /> PULLSECTION SOCKETS EUSERC 306 A 06/10/25 90% ZONING FA <br /> EUSERC 327,347 <br /> TEST BLOCKS EUSERC 311 0 07/14/25 100% ZONING FA <br /> METAL COVERS 1 07/22/25 100% ZONING FA <br /> AND HASPS <br /> 200 200 200 200 <br /> G <br /> CIRCUIT BREAKERS <br /> ELECTRICAL U/G SERVICE 11101 N UGC 800-3 W6MM8-3PGE ll <br /> TERMINATION SECTION, <br /> 600A,120/208V, 3 PHASE <br /> (N)#2 GROUND COPPER <br /> • <br /> (N)3/4" C W/#2 GROUND COPPER <br /> BONDED TO 5/8"X 8' LONG <br /> PANEL SCHEDULE COPPERCLAD STEEL GROUND <br /> ROD <br /> (N)2"C-3#4/0, 1#6 GROUND, <br /> COPPER THHN/THWN-2 (UP <br /> MAIN ELECTRICAL PANEL <br /> TO 150 FT) <br /> MANUFACTURED BY INTERSECT, INC MODEL AA3003R SERIES LICENSOR: <br /> 120/208 V, 1 PHASE, 3 WIRE, 30 kw, 200 AMP BUS, 42KAIC <br /> 200 AMP/2P MAIN BREAKER (N)200A/2P ILC 120/208 V, 1 PHASE, <br /> DESCRIPTION %N0. <br /> PHASE 1 PHASE 2 CKT C DESCRIPTION 3 WIRE, MAIN PANEL BY <br /> N0. B INTERSECT, INC- NEMA 3R <br /> 30 1 3,600 - 2 30 NGHTS (TYP. OF 4)) SERVICE ENCLOSURE <br /> L <br /> 48VDC POWER PLANT RECTIFIER #1 48VDC POWER PLANT RECTIFIER #5 0 <br /> 2 3 - 3,600 4 /2P� <br /> 30A 5 3,600 - 6 30A ATs <br /> 48VDC POWER PLANT RECTIFIER #2 48VDC POWER PLANT RECTIFIER #6 0 <br /> /2P 7 - 3,600 8 /2P <br /> (N) 3/4"-1#6 GROUND, INTERSECT LOAD CENTETR IT IS A VIOLATION OF LAW FOR ANY <br /> COPPER BONDED TO MAIN W/30 CIRCUIT POSITIONS PERSONS, UNLESS THEY ARE <br /> 30A 9 3,600 - 10 30A GROUND SYSTEM ACTING UNDER THE DIRECTION <br /> 48VDC POWER PLANT RECTIFIER #3 48VDC POWER PLANT RECTIFIER #7 - OF A LICENSED PROFESSIONAL <br /> 11 - 3,600 12 <br /> ENGINEER, TO ALTER THIS <br /> 2 2P <br /> DOCUMENT <br /> 30 3,600 - 14 30 <br /> 48VDC POWER PLANT RECTIFIER #4 13 48VDC POWER PLANT RECTIFIER #8 (N)6-HR WIND UP PROJECT NAME: <br /> /2P 15 3,600 16 /2P <br /> WP/J BOX TIMER SWITCH <br /> 17 <br /> 1 ,200 - 18 0 S CKT 26 FIBER CABINET/MISC. GFI RECEPTACLE 1 pi W <br /> SURGE SUPPRESSOR <br /> 2 19 - 1 ,200 20 0A z <br /> FIBER CABINET/MISC. GFI RECEPTACLE 2 <br /> (N)2"C-3#1/0, 1#6 GROUND, Z <br /> 15A Q 1"C-2#12, 1#12 GROUND COPPER, THHN/THWN-2 O O > <br /> Lu <br /> 48VDC POWER PLANT INTERIOR OUTLET 1 21 500 - 22 SPARE FOR FUTURE CABINET COPPER, THHN/THWN-2 Q <br /> 0 - 1 ,200 24 20 TO MISC. CABINET � 0 � <br /> STANDBY GENERATOR BATT. CHARGER P 23 P SPARE FOR FUTURE CABINET CKT22&24 Z M <br /> o .4 In <br /> STANDBY GENERATOR BLOCK HEATER 25 1 ,200 - 26 P SERVICE LIGHTS CKT 98&20 (N) 1"C FOR ALARM J on <br /> CKTS 1 3 24 57 68 9 11 10 12 13 15 14 16 97 99 & 29 WIRING TO MISC. = Q <br /> SPACE 27 - 500 28 - SPACE � ' �� �� ' �� �� �� �� �� >� CABINET <br /> 2 " <br /> SPACE 29 30 SPACE 2 O <br /> (N) 1"C-2#12, 1#12 (N) 1"C-2#12, 1#12 F- a <br /> LOAD PHASE 1 17,300 17,300 LOAD PHASE 2 GROUND, COPPER, GROUND, COPPER, C 4 ER, C-6# 10, 1# 10 GROUND N VERIZON WIRELESS 30KW cn <br /> THHN/THWN-2 THHN/THWN-2 COPPER, THHN/THWN-2)&3/4" C- ( ) O <br /> 2#12, 1#12 GROUND, COPPER THHN / KOHLER STANDBY GENERATOR 0 <br /> TOTAL LOAD (PHASE 1 & 2) = 34,600 VA THWN-2 W/164 GALLON DIESEL TANK uj <br /> In <br /> BASIN (UL142) ON <br /> CO <br /> ADDITIONAL 25% CONTINUOUS LOAD = 125 VA (N) VC-2#12, 1#12 GROUND (N) 10'-0"X 20'-0"CONCRETE PAD N <br /> 48V COPPER, THHN/THWN-2 (STANDBY C4 <br /> TOTAL LOAD = 34,725 VA FUTURE MISC. <br /> DC GENERATOR BATTERY CHARGER) <br /> CABINET CAB/NET POWER <br /> PLANT/ <br /> TOTAL AMPS = 144.7 AMPS G G G G BA G GY (N) VC-2#12, 1#12 GROUND COPPER, <br /> THHN/THWN-2 (STANDBY GENERATOR <br /> TOTAL KVA = 32.2 KVA <br /> BLOCK HEATER) SHEET TITLE: <br /> 150A <br /> 2P M G SINGLE LINE DIAGRAM <br /> CKT23 PANEL SCHEDULE & <br /> (N)#2 AWG CKT25 UTILITY NOTES <br /> G G <br /> J J J J J J — Eml <br /> (N)#4 AWG PER GENERAC <br /> REQUIREMENTS <br />