Laserfiche WebLink
The following is an itemized list of CP22 - AST Non-Qualified violations that have not <br /> been addressed for CALIFORNIA FREIGHT as of January 30, 2026. <br /> Open violations from November 05, 2025 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #59 - 4010056 - SPCC adequately describes overfill prevention methods, and devices/systems used <br /> for each container. <br /> OBSERVATION: The Spill Prevention, Control, and Countermeasure (SPCC) Plan failed to adequately describe the <br /> overfill prevention methods, including a description of the devices or systems in place for each container to prevent <br /> overfills or failed to include a discussion of facility's conformance with the requirements listed in § 112.7. <br /> REGULATION GUIDANCE: 112.7 (a)(1) Include a discussion of your facility's conformance with the requirements listed <br /> in this part [§112.7]. 112.8 (c)(8) Engineer or update each container installation in accordance with good engineering <br /> practice to avoid discharges. You must provide at least one of the following devices: (i) High liquid level alarms with an <br /> audible or visual signal at a constantly attended operation or surveillance station. In smaller facilities an audible air <br /> vent may suffice. (ii) High liquid level pump cutoff devices set to stop flow at a predetermined container content level . <br /> (iii) Direct audible or code signal communication between the container gauger and the pumping station. (iv) A fast <br /> response system for determining the liquid level of each bulk storage container such as digital computers, telepulse, <br /> or direct vision gauges. If you use this alternative, a person must be present to monitor gauges and the overall filling of <br /> bulk storage containers. (v) You must regularly test liquid level sensing devices to ensure proper operation . <br /> CORRECTIVE ACTION: The SPCC plan shall adequately address overfill prevention methods, including a description <br /> of the devices or systems in place for each container to prevent overfills. Provide proof of correction to the EHD. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 6 of 10 <br />